| Plan |
Name of the maintenance plan that this schedule is a part
of. |
| Active |
Select the check box to activate the schedule for the
maintenance plan. |
| Trigger |
Timing condition that triggers the execution of the plan.
- Duration: Maintenance to
be performed based on time. Depending on your
selection, additional fields appear to define the
duration.
- Meter: Maintenance to be
performed based on count. The
Every and
Field fields appear.
- Condition: Maintenance to
be performed when a certain condition is met. The
Filter condition field
appears
- Script: Apply advanced
criteria for running a maintenance plan. The
Script field appears.
- Duration or Meter:
Maintenance to be performed based on both time and
count, whichever comes first. You must specify the
duration and meter details.
|
| Trigger type |
Duration category for the maintenance schedule. For
example, if you select Monthly, the
Due day of month field appears so
you can specify which day of each month to run maintenance.
Different fields appear depending on the trigger type
selected. This field appears when
Duration is selected for
Trigger. |
| Repeat |
Frequency of the repetition. This field appears when
Interval is selected for
Trigger type. |
| Due day of week |
Day of week to repeat on. This field appears when
Weekly is selected for
Trigger type. |
| Due day of month |
Day of the month to repeat on. This field appears when
Monthly or
Annuallyis selected for
Trigger type. |
| Due month |
Month to repeat on. This field appears when
Annually is selected for
Trigger type. |
| Due time |
Time of day in hours, minutes, and seconds. This field
appears for all trigger types except
Interval. |
| Every |
Number of occurrences, such as miles or pages, that must
be recorded before the maintenance plan is executed. Must be
greater than zero (0). This field appears when
Meter is selected for
Trigger. |
| Field |
Field used to define what the occurrences in the
Every field apply to. For
example, if the pages field is
entered, the Every field can contain
the number of pages that are printed before the action
defined in the plan is performed. This field appears when
Meter is selected for
Trigger. |
| Table |
Lists the table associated with the assets or CIs
selected for maintenance. This field appears when
Meter or
Condition is selected for
Trigger. |
| Lead time |
Number of days prior to the Requested Due
by date to determine the date on which work
should begin. That date is pre-filled in the
Scheduled start field for the
task. This field appears when
Duration is selected for
Trigger. |
| Condition |
Condition that determines if the maintenance schedule
should run. This field appears when
Condition is selected for
Trigger. |
| Script |
Script that determines if the maintenance schedule should
run. This field appears when Script is
selected for Trigger. Maintenance
runs if the script returns true. The "current" variable is
available and represents the record that is undergoing
maintenance, for example, a CI. |