---
sourceDocument: australia Combined Product Files
sourceDocumentLink: https://www.servicenow.com/docs/r/australia/delta-zurich-australia

 Release :

    - australia

ft:locale :

    - en-US

ft:publication_title :

    - australia Combined Product Files

ft:clusterId :

    - delta3az

bundleId :

    - delta3az


---

# Combined Industrial Centerlines release notes for upgrades from Zurich to Australia

# Combined Industrial Centerlines release notes for upgrades from Zurich to Australia {#ariaid-title1}

Release version: Australia  
Updated November 5, 2026  
![](https://www.servicenow.com/docs/portal-asset/ico-clock) 4 minutes to read
Summarize  
![AI sparkle icon](https://servicenow.com/docs/portal-asset/ai-sparkle-icon) Summarized using AI  
This content was generated using new OpenAI-powered functionality. Results are provided on an as is basis and are not guaranteed to be accurate or complete.  

## Summary of Combined Industrial Centerlines Release Notes for Upgrades from Zurich to Australia

This consolidated guide provides ServiceNow customers with all relevant release notes for Industrial Centerlines when upgrading from the Zurich release family to Australia.
It highlights new features introduced in Australia, important pre- and post-upgrade tasks, activation details, and notes on changes, removals, deprecations, and requirements relevant for a smooth transition.
Show full answer Show less  

## New Features in Australia

* **Setting Definitions on Operational Equipment:** Define configurable parameters directly on the equipment record's Settings tab, supporting specific field types (choice, numeric range) and optional effective date ranges. Definitions require approval before use, can be duplicated for reuse, and can be retired when obsolete.
* **Setting Plans and Specifications:** Group standard values for equipment in setting plans, and specify target values and limits for each setting definition in setting specifications. Specification forms adapt based on setting type, and duplication of specifications is supported.
* **Centerline Standards:** Create standards via the Standards hub to specify which settings operators must check during centerline audits. Use condition builders to select setting definitions and define material scope for mobile tasks. Standards support approval workflows, versioning, and templates consistent with Industrial Guided Tasks.
* **Centerline Tasks in Digital Factory Workspace:** Manage and filter centerline tasks generated from standards within a dedicated list. Authorized users can edit tasks and assign them to themselves. Task execution occurs through the Industrial Connected Workforce Mobile Experience.
* **Standardization and Automation:** Define operator-modifiable equipment settings with various value types (numeric range, target, choice, text). Automate scheduling of confirmation tasks and reduce quality and reliability issues by verifying settings and generating deviation tasks for non-conformance.

## Upgrade and Activation Guidance

* **Upgrade Notes:** No updates or changes were noted specifically for Zurich or Australia releases except the new feature additions.
* **Activation:** Industrial Centerlines does not have a standalone SKU and is included in the Industrial Connected Workforce (ICW) Advanced SKU. Customers can request ICW Advanced via the ServiceNow Store.
* **Additional Requirements and Browser Support:** No new requirements or browser changes were introduced between Zurich and Australia for Industrial Centerlines.
* **Accessibility and Localization:** No special accessibility or localization updates were noted for this upgrade path.

## Practical Benefits for ServiceNow Customers

* Gain enhanced control and flexibility over equipment settings with approval workflows and reusable configurations.
* Streamline centerline audit processes through configurable standards and automated task management in the Digital Factory Workspace and mobile interface.
* Improve operational quality by defining clear setting targets and limits, enabling proactive identification and resolution of deviations.
* Easily manage upgrades with consolidated release notes and minimal impact from removals or deprecations.  
Consolidated page of all release notes for Industrial Centerlines from Zurich to Australia.

## How to use this page

To help you prepare for your upgrade, we have combined the cross-family Industrial Centerlines release notes onto one page. Read this summary of the new features, changes, and updated information for your product from Zurich to Australia.  
Tip:  
If there were no updates for a release notes section in a certain family release, we included a short note for your reference. For example, if a product did not have any updates in Tokyo, the row says "No updates for this release."

## Important information for upgrading Industrial Centerlines to Australia

Before you upgrade to Australia, review these pre- and post-upgrade tasks and complete the tasks as needed.  
{#dfrn3-industrialcenterlines-summary__entry__2}

| Release | Release notes |
|-|-|
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
[ ]

## New features

Between your current release family and Australia, new features were introduced for Industrial Centerlines.  
{#dfrn3-industrialcenterlines-summary__entry__8}

| Release | Release notes |
|-|-|
| Zurich | No updates for this release. |
| Australia | [Setting definitions on operational equipment](https://www.servicenow.com/docs/access?context=icw-setting-definitions-and-value-types&family=australia&ft:locale=en-US) :   Define each configurable parameter directly on the Settings tab of an equipment record, with type-specific fields for choice and numeric range settings and an optional effective date range. Setting definitions go through an approval workflow before they can be used in centerline tasks. Duplicate one or more definitions to reuse their configuration, and retire published definitions that are no longer valid. [Setting plans and setting specifications](https://www.servicenow.com/docs/access?context=icw-setting-plans-and-specifications&family=australia&ft:locale=en-US) :   Group the standard values for a piece of equipment in a setting plan, and define the target values and limits for each setting definition in a setting specification. The specification form shows only the fields that apply to the setting type, such as limit levels for a numeric range or a choice target for a choice setting. Duplicate a specification to reuse its values. [Centerline standards](https://www.servicenow.com/docs/access?context=icw-centerline-standards&family=australia&ft:locale=en-US) :   Create a centerline standard from the Standards hub to define the settings that operators check during a centerline audit. Use the condition builder to select the setting definitions for the standard, and set the material scope that's available when operators run the task on mobile. Centerline standards follow the same approval, versioning, and template workflow as Industrial Guided Tasks standards. [Centerline tasks in the Digital Factory Workspace](https://www.servicenow.com/docs/access?context=centerline-tasks-workspace&family=australia&ft:locale=en-US) :   View, filter, and manage the tasks generated from centerline standards in a dedicated list in the Digital Factory Workspace. Authorized users can edit task data fields and assign a task to themselves using the Assign to me action. Centerline tasks are executed in the Industrial Connected Workforce Mobile Experience. |
[ ]

## Changes

Between your current release family and Australia, some changes were made to existing Industrial Centerlines features.  
{#dfrn3-industrialcenterlines-summary__entry__14}

| Release | Release notes |
|-|-|
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
[ ]

## Removed

Between your current release family and Australia, some Industrial Centerlines features or functionality were removed.  
{#dfrn3-industrialcenterlines-summary__entry__20}

| Release | Release notes |
|-|-|
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
[ ]

## Deprecations

Between your current release family and Australia, some Industrial Centerlines features or functionality were deprecated.  
{#dfrn3-industrialcenterlines-summary__entry__26}

| Release | Release notes |
|-|-|
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
[ ]

## Activation information

Review information on how to activate Industrial Centerlines.  
{#dfrn3-industrialcenterlines-summary__entry__32}

| Release | Release notes |
|-|-|
| Zurich | No updates for this release. |
| Australia | Activation information :   Industrial Centerlines doesn't have its own SKU. It's included in the ICW Advanced SKU. You can request ICW Advanced from the ServiceNow Store. Visit the [ServiceNow Store](https://store.servicenow.com/sn_appstore_store.do#!/store/home) to view all the available apps, and for information about submitting requests to the store. For cumulative release notes information for all released apps, see the [ServiceNow Store version history release notes](https://www.servicenow.com/docs/access?context=sn-store-release-notes&family=australia&ft:locale=en-US). |
[ ]

## Additional requirements

If any additional requirements were introduced or changed for Industrial Centerlines we have noted them here.  
{#dfrn3-industrialcenterlines-summary__entry__38}

| Release | Release notes |
|-|-|
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
[ ]

## Browser requirements

If any specific browser requirements were introduced or changed for Industrial Centerlines we have noted them here.  
{#dfrn3-industrialcenterlines-summary__entry__44}

| Release | Release notes |
|-|-|
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
[ ]

## Accessibility information

Review details on accessibility information for Industrial Centerlines, such as specific requirements or compliance levels.  
{#dfrn3-industrialcenterlines-summary__entry__50}

| Release | Release notes |
|-|-|
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
[ ]

## Localization information

If there are specific localization considerations for Industrial Centerlines we have noted them here.  
{#dfrn3-industrialcenterlines-summary__entry__56}

| Release | Release notes |
|-|-|
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
[ ]

## Highlight information

If there are specific highlight considerations for Industrial Centerlines we have noted them here.  
{#dfrn3-industrialcenterlines-summary__entry__62}

| Release | Release notes |
|-|-|
| Zurich | No updates for this release. |
| Australia | * Standardize equipment base conditions by defining the operator-modifiable settings for each piece of equipment, with value types such as numeric range, numeric target, choice, or text. * Establish acceptable values, ranges, and targets for each setting through setting specifications grouped in setting plans. * Automate confirmation scheduling with centerline standards that define which settings to verify and when. * Reduce quality and reliability losses by having operators confirm settings during centerline tasks, and create deviation tasks when a setting doesn't conform to the standard. See [Industrial Centerlines](https://www.servicenow.com/docs/access?context=icw-centerlining-overview&family=australia&ft:locale=en-US) for more information. |
[ ]


