# Connect with CWM

# Connecting EAP with Collaborative Work Management {#ariaid-title1}

Release version: Australia  
Updated October 22, 2026  
![](https://www.servicenow.com/docs/portal-asset/ico-clock) 3 minutes to read
Summarize  
![AI sparkle icon](https://servicenow.com/docs/portal-asset/ai-sparkle-icon) Summarized using AI  
This content was generated using new OpenAI-powered functionality. Results are provided on an as is basis and are not guaranteed to be accurate or complete.  

## Summary of Connecting EAP with Collaborative Work Management

The integration between Enterprise Agile Planning (EAP) and Collaborative Work Management (CWM) enables organizations to unify strategic program planning with team-level execution in a single platform.
This connection eliminates silos, enhances visibility, and improves delivery predictability by linking high-level priorities with day-to-day agile work.
Show full answer Show less  
Program managers and release train engineers use EAP to define Program Increment (PI) objectives, align Epics, Features, and Stories, create sprints, and manage cross-team dependencies. After each PI, retrospectives and roadmap updates help continuously align enterprise priorities. By connecting to CWM, product owners and team members gain the ability to plan and execute sprints, manage agile stories alongside operational tasks such as incidents, and track progress without losing strategic alignment.

This integration reduces context switching, accounts for both planned and unplanned work, and provides leadership with end-to-end transparency from strategic goals in EAP down to team execution in CWM.

## Workflow and Usage

* An EAP administrator connects an EAP team to CWM, which automatically creates a corresponding Space and Board in CWM for that team.
* Existing work items assigned to the EAP team are imported into the CWM Board using Connected Work filters, and sprint planning views are enabled to display these items.
* Teams can manage current work, create additional work, and update progress directly from the CWM Board, with status reflected back on the EAP Agile Team dashboard.
* Team members must have appropriate access and CWM user roles assigned to collaborate effectively.

## Sprint Management

* Sprints and scheduled work created in EAP automatically sync to CWM and appear in the Sprint Planning view.
* Teams update sprint progress and work status within CWM, mark sprints complete, and move incomplete work to backlog or future sprints as needed.
* New sprints must be created in EAP, then sync to CWM for team scheduling.
* Changes to sprint start or end dates in EAP automatically update linked sprints in CWM.
* Sprints are created at the Agile Release Train (ART) level for multi-level iteration configurations, while single-level iteration setups allow Agile Teams to create sprints directly that sync with CWM.

## Interface and Navigation

* Key EAP tabs such as Home, Backlog, Hierarchy, Planning board, and Docs remain accessible for teams connected to CWM.
* Because sprint lifecycle actions (start and complete) occur in CWM, these options are hidden in EAP for connected teams.
* Connected teams in EAP display a "Connected to CWM" label and provide a direct link to the team's CWM Board for ease of navigation.
* CWM's Sprint Planning view informs users that sprint management is handled through EAP for connected teams.

## Benefits for ServiceNow Customers

* Streamlines coordination between strategic planning and team execution by unifying EAP and CWM.
* Improves delivery predictability and enterprise alignment with transparent progress tracking from leadership to teams.
* Reduces context switching by consolidating agile and operational work management in one workspace.
* Supports flexible sprint management tailored to organizational cadence and iteration levels.  
Enhance visibility and streamline planning for your Agile teams by connecting Enterprise Agile Planning (EAP) with Collaborative Work Management (CWM).

## Overview of EAP-CWM connection {#integrate-eap-with-collaborative-work-management__section_qls_mtr_3hc}

The EAP-CWM integration enables organizations to connect strategic program planning with team-level execution in a single system, eliminating silos and improving delivery predictability.

Using EAP, program managers and release train engineers can define Program Increment (PI) objectives, align Epics, Features, and Stories, create sprints for teams, and manage cross-team
dependencies. After completing a PI, they can conduct PI retrospectives and update roadmaps for the next cycle. These capabilities ensure that enterprise priorities are clearly structured and traceable across all levels.

By linking EAP to CWM. Product owners and team members can plan and execute sprints. They can also manage agile stories alongside operational tasks such as incidents, track progress, and hold team-level
retrospectives, all within the same workspace.

This connection between the applications reduces context switching and ensures that both planned and unplanned work is accounted for, without losing alignment to strategic goals. The result is end-to-end transparency where
leadership can track progress against PI goals through EAP, while teams maintain flexibility to adapt to changing priorities.

## Workflow of EAP-CWM integration {#integrate-eap-with-collaborative-work-management__section_wgj_ntr_3hc}

1. EAP admin connects an EAP team to CWM. See [Connect an EAP team with CWM](https://www.servicenow.com/docs/hZHJ4cYO9bVCbmf_3i7L5g "Establish a connection to CWM by setting your EAP team's Agile tool to Collaborative Work Management.").
2. A new Space and Board are created for this EAP team in the CWM workspace.
3. Existing work items assigned to this EAP team are brought over to the newly created CWM Board through Connected Work filters.
4. Sprint planning view is enabled for this CWM Board where the existing work items and sprints are automatically shown.
5. Check team's access to CWM and provide the CWM user \[sn_cwm.cwm_user\] to all team members.
6. EAP team can start creating more work, manage current work, and update progress directly from the CWM Board. See [Sprint planning in CWM](https://www.servicenow.com/docs/dDqdFUaCfdkU4cqD9eBVBg "Plan, track, and manage work for your teams in the Agile methodology using Sprint planning in Collaborative Work Management.").
7. The team's progress and work status is reflected back on the Team dashboard in the EAP workspace. See [EAP Agile Team dashboard](https://www.servicenow.com/docs/hEyF1Py4cMfv9PUDFU9zZg "The Agile Team dashboard provides you with sprint progress and team performance details for an Agile team in the Enterprise Agile Planning (EAP) workspace.")
{#integrate-eap-with-collaborative-work-management__ol_xtz_lvr_3hc}

## Creating or managing sprints for EAP teams in CWM {#integrate-eap-with-collaborative-work-management__section_sdx_yzg_jhc}

For EAP teams integrated with CWM, existing sprints and their scheduled work automatically sync to CWM. These details are displayed in the Sprint Planning view on the CWM Board.

As the team progresses through assigned work, they can update the work status directly in the Sprints section. The sprint can be marked Complete from this view and any incomplete work items can be moved
either to the backlog or the next sprint, if it exists.

New sprints for the team must be created in EAP. After creating new sprints in EAP, they will sync to CWM, allowing the team to schedule work into these sprints from CWM.

When you change the start date or the end date of an iteration in EAP, the linked sprint in CWM is updated with the new dates. Sprints that don't follow a planning calendar entry sync by using the dates on the iteration record itself. A team on a configuration with a single level of
iterations can connect to CWM and keep its own cadence. For more information, see [Creating iterations for teams in EAP](https://www.servicenow.com/docs/T37_C7O_E8v0ZMalO6gIWQ "Create Planning Intervals (PIs) and Sprints directly from the Backlog by entering start and end dates, without setting up planning calendar entries first.").  
Note:  
Sprints for EAP teams are not created directly at the Agile team level. Sprints are created automatically when a Planning Interval (PI) is defined for the parent Agile Release Train (ART) in EAP and sync to CWM automatically. On a configuration that has a single level of iterations, an Agile Team creates its Sprints directly and those Sprints sync in the same way.

## Tabs and links for connected teams {#integrate-eap-with-collaborative-work-management__section_cwm_backlog_hierarchy_access}

The Home, Backlog, Hierarchy, Planning board, and Docs tabs in EAP remain available for teams connected to CWM. You can continue to view and manage the team's work items in EAP.

Because sprints are started and completed from the CWM Board, the Start Sprint and Complete Sprint options are hidden in the EAP Backlog for these teams. For more information, see [Start or complete iterations in EAP](https://www.servicenow.com/docs/Nu09BnEqpyN_6EFD8IBr8w "Start an iteration of a Sprint or PI so that your team can start working and tracking progress of work. After your team finishes the assigned work, mark this iteration as complete, directly from the Backlog in Enterprise Agile Planning.").

In the Agile structure of your team in EAP, a connected team shows the label Connected to CWM. On the team page, select Go to CWM to open the team's board in CWM. In CWM, the Sprint planning view shows a message that sprints for the board are managed in the EAP team.
**Related concepts**   

* [Collaborating with Spaces in CWM](https://www.servicenow.com/docs/EJElbUfLXD4Am75wHQh_MQ "Create collaborative Spaces for teams to work together on projects, goals, or assignments.")
* [Managing work using Boards in CWM](https://www.servicenow.com/docs/5nt_jb870wOloMMvl30J3Q "Use Boards in Collaborative Work Management to define and organize tasks. With views such as Dashboard, List, Kanban, and Gantt, configure your workspace based on the way you and your team work.")
* [Connected work in CWM](https://www.servicenow.com/docs/eySVrAgz7O_1XkonS6Mf4Q "Streamline task management for teams by bringing in various work items from across ServiceNow applications into Boards in Collaborative Work Management.")
* [Sprint planning in CWM](https://www.servicenow.com/docs/dDqdFUaCfdkU4cqD9eBVBg "Plan, track, and manage work for your teams in the Agile methodology using Sprint planning in Collaborative Work Management.")
* [EAP Agile Team dashboard](https://www.servicenow.com/docs/hEyF1Py4cMfv9PUDFU9zZg "The Agile Team dashboard provides you with sprint progress and team performance details for an Agile team in the Enterprise Agile Planning (EAP) workspace.")