Create a work scheduler card and add the components that you want to display based on your needs in the Work Scheduler application in manager workspace.
Before you begin
Role required: admin, workspace_admin, or ui_builder_admin​
Procedure
-
Navigate to .
-
In the My experiences list, select Manager Workspace.
-
Select the Pages icon.
-
In the Page menu, select Work scheduler.
-
In the left pane, go to the Content section and navigate to .
-
In the right pane, select the icon (
) in the Work item cards default sub-page.
-
In the left pane, select .
-
In the right pane, select +Add and enter a name for the card.
The Path field is automatically populated.
-
Select Create.
A new card is created.
Important: After you create the work scheduler card, you must select the name of this card in the
UX app route field in the work configuration you have created. For information on setting up a
work configuration, see
Set up a work configuration.
-
Select Done.
Follow the steps listed in each of the topics below in the given sequence to customize Work scheduler.