# Update a non-monetary benefit plan breakdown for a project

# Update a non-monetary benefit plan breakdown for a project {#ariaid-title1}

* Freigeben Version: Australia
* 
* Aktualisiert 12. März 2026
* 
* ![](https://www.servicenow.com/docs/portal-asset/ico-clock) 1 Minute Lesedauer

Update a non-monetary benefit plan breakdown record that specifies the estimated and
actual benefits, at a granular level, for specific fiscal periods.

## Vorbereitungen

Role required: it_project_manager

## Prozedur

1. Navigate to AllProjectProjectsAll.
2. Open the required project.
3. Select the Non-monetary Benefit Plans related list.
4. Open the required non-monetary benefit plan.
5. In the Non-monetary Benefit Plan Breakdowns related list, select the information icon (![information icon.]()) for a non-monetary benefit plan breakdown.
6. Select Open Record.
7. On the Non-monetary Benefit Plan Breakdown form, view and update the enabled fields.

   | Field | Description |
   | Task | Task to which the benefit plan breakdown belongs. |
   | Portfolio | Portfolio to which the benefit plan breakdown belongs. |
   | Measure | Measure type specified in the benefit plan. |
   | Actual benefit | Actual benefit that is incurred from the project or demand. |
   | Benefit plan | Benefit plan to which the benefit plan breakdown belongs. |
   | Fiscal period | Fiscals generated at the period level. For information on periods, see [fiscal calendars](https://www.servicenow.com/docs/access?context=c_FiscalCalendar&version=australia&pubname=australia-platform-administration&ft:locale=en-US). |
   | Entered benefit | Benefit in entered value. |
   | Variance | The difference between the estimated and actual benefit. |
   |-|-|

   {#update-a-non-monetary-benefit-plan-breakdown-for-a-project__choicetable_os3_4p1_dcb}
8. Select Update.
{#update-a-non-monetary-benefit-plan-breakdown-for-a-project__steps_xh4_m1z_jpb}
**Zugehörige Tasks**   

* [Create a non-monetary benefit plan for a project](https://www.servicenow.com/docs/VxIBR0UlYHEkHPrp5P2Vww "Create a non-monetary benefit plan to specify the estimated benefit in a category spanning one or more fiscal periods. Project benefit plans capture the potential non-financial benefits accrued by the project when the project is executed.")