# Run your tests from the List view

# Run your tests from the List view {#ariaid-title1}

* Freigeben Version: Australia
* 
* Aktualisiert 12. März 2026
* 
* ![](https://www.servicenow.com/docs/portal-asset/ico-clock) 1 Minute Lesedauer

View the test scenario, execute all the steps of the test, and review the test
result.

## Vorbereitungen

Role required: scrum_user

## Prozedur

1. Navigate to AllAgile DevelopmentAgile Board.
2. Click the Sprint Tracking tab and select the List view.
3. Click a test.
4. Verify a story by clicking Run on the story.  
   This step runs all tests of the story at once.
5. In the pop-up, select the environment on which the test is to be run.  
   1. Click Lookup using list icon.
   2. Click Run.
   {#run-test-plan-within-agile2__ol_mng_qrc_3cb}
6. In the Test Execution pop-up, mark a step as passed, failed, or blocked using the following icons.

   | Icon | Description |
   | ![Step passed icon]() | Passed. |
   | ![Step failed icon]() | Failed. In this state, options to add comments and attachments are available. Option to delete attachments is also available. |
   | ![Step blocked icon]() | Blocked. In this state, options to add comments and attachments are available. Option to delete attachments is also available. |
   |-|-|

   {#run-test-plan-within-agile2__choicetable_p33_dsw_dcb}  
   * To select an icon, you can also use the Tab key. Press Tab and then press Enter.
   * To pause and work on the test at a later point in time, click Pause.
   {#run-test-plan-within-agile2__ul_fqj_dxv_12b}
7. Click Done.

## Ergebnisse

Test result is saved to the Test Result form, and the latest test result of each test
is displayed in the List view.  
The overall status of the test is defined by statuses of the test steps:

* If all the test steps are passed, the status of the test is Passed.
* If at least one step of the test is not run, the status of the test is Not finished.
* If at least one step of the test fails, the overall status of the test is Failed. This rule takes precedence over the previous rule.
* If at least one step of the test is blocked, the overall status of the test is Blocked. This rule takes precedence over the previous two rules.
{#run-test-plan-within-agile2__ul_xlb_mdd_gcb}
**Zugehörige Tasks**   

* [Create a test for a story](https://www.servicenow.com/docs/JzcXbu2tw9tPuLrsPK4e2g "Create a test, add steps to the test, and create and maintain different versions of the test. A test is a collection of conditions or steps used to determine whether a story is working correctly. A test can also include an expected result, which determines whether the test passes or fails.")