---
sourceDocument: brazil Combined Product Files
sourceDocumentLink: https://www.servicenow.com/docs/r/delta-yokohama-brazil

 Release :

    - brazil

ft:locale :

    - en-US

ft:publication_title :

    - brazil Combined Product Files

ft:clusterId :

    - delta3by

bundleId :

    - delta3by


---

# Combined Industrial Guided Tasks release notes for upgrades from Yokohama to Brazil

# Combined Industrial Guided Tasks release notes for upgrades from Yokohama to Brazil {#ariaid-title1}

Release version: Brazil  
Updated October 8, 2026  
![](https://www.servicenow.com/docs/portal-asset/ico-clock) 5 minutes to read
Summarize  
![AI sparkle icon](https://servicenow.com/docs/portal-asset/ai-sparkle-icon) Summarized using AI  
This content was generated using new OpenAI-powered functionality. Results are provided on an as is basis and are not guaranteed to be accurate or complete.  

## Summary of Combined Industrial Guided Tasks Release Notes for Upgrades from Yokohama to Brazil

This consolidated document provides ServiceNow customers with a clear and comprehensive overview of Industrial Guided Tasks (IGT) release notes spanning from the Yokohama to Brazil releases.
It is designed to assist you in preparing for your upgrade by summarizing new features, changes, activation details, and other important upgrade considerations for Industrial Guided Tasks within the Industrial Connected Workforce (ICW) environment.
Show full answer Show less  

## Key Features Introduced Between Yokohama and Brazil

Most new features were introduced in the Australia release, enhancing the Industrial Guided Tasks capabilities significantly. Key enhancements include:

* **Reporting on Question Results:** Enables detailed analysis of inspection results at the question level using the new `snicwigtresults` database view. Users with the `snicw.reportuser` role can filter and group data by functional location, equipment, standards, and shifts for improved quality control and insights.
* **Question Bank:** Facilitates consistency by allowing creation and publication of reusable assessment questions across standards, managed via the Assessment Workspace by users with the `snicwigt.manager` role.
* **Authoring Guided Tasks:** Offers a structured workflow authoring interface with built-in rules for consistency, safety, and quality. Authors can design tasks with sections, steps, assessments, and conditional paths, and preview the end-user experience before publishing.
* **Assessment-Driven Scoring and Execution:** Supports multiple assessment types such as numeric inputs and conditional evaluations. Automatic scoring categorizes task outcomes as Successful, Unsuccessful, or Not Scored, enabling data capture for reporting and continuous improvement.
* **Automation and Smart Actions:** Allows configuration of automated follow-up work, task routing, and complex logic to reduce manual intervention. This feature requires an additional plugin and supports dynamic, adaptive task execution.
* **Easy Accessibility and Execution:** Provides a user-friendly, step-by-step guided task interface with support for images, validations, attachments, barcode/QR scanning, and offline access through the ICW mobile application to ensure uninterrupted operations in low-connectivity environments.
* **IGT Lifecycle Governance:** Introduces lifecycle states with review and approval workflows for improved governance, audit readiness, and quality assurance. Historical versions are archived to support audits and root cause analysis.
* **Standards Creation Using Templates:** Accelerates task creation by reusing existing task structures, including steps and conditional logic, promoting consistency and reducing authoring effort.

## Changes, Removals, and Deprecations

No updates, removals, or deprecations were recorded for Industrial Guided Tasks from Yokohama through Brazil releases, indicating stability and continuity of features within these versions.

## Activation and Deployment

Industrial Guided Tasks is automatically installed with the Industrial Connected Workforce Mobile Experience as part of the ICW Foundational SKU. It is available in the ServiceNow Store, and customers can request ICW Mobile to gain access. Activation details remain consistent across releases with no new changes introduced through Brazil.

## Additional Considerations

* **Pre- and Post-Upgrade Tasks:** Customers are advised to review and complete any necessary upgrade tasks to ensure a smooth transition.
* **Browser, Accessibility, and Localization:** No new requirements or changes have been introduced across these releases.
* **Highlights:** The Australia release emphasized faster and more consistent task authoring, enhanced assessment accuracy, improved frontline usability, and comprehensive lifecycle governance integrated across the ICW suite.

## What Customers Can Expect

By upgrading to Brazil (with features primarily introduced in Australia), ServiceNow customers can expect a more robust and efficient Industrial Guided Tasks experience that streamlines task creation, execution, and governance. You will benefit from improved data-driven insights, enhanced task automation, and better support for frontline workers through usability and offline capabilities. Governance improvements ensure your guided tasks comply with operational and safety standards while maintaining audit readiness.  
Consolidated page of all release notes for Industrial Guided Tasks from Yokohama to Brazil.

## How to use this page

To help you prepare for your upgrade, we have combined the cross-family Industrial Guided Tasks release notes onto one page. Read this summary of the new features, changes, and updated information for your product from Yokohama to Brazil.  
Tip:  
If there were no updates for a release notes section in a certain family release, we included a short note for your reference. For example, if a product did not have any updates in Tokyo, the row says "No updates for this release."

## Important information for upgrading Industrial Guided Tasks to Brazil

Before you upgrade to Brazil, review these pre- and post-upgrade tasks and complete the tasks as needed.  
{#dfrn3-industrialguidedtasks-summary__entry__2}

| Release | Release notes |
|-|-|
| Yokohama | No updates for this release. |
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
| Brazil | No updates for this release. |
[ ]

## New features

Between your current release family and Brazil, new features were introduced for Industrial Guided Tasks.  
{#dfrn3-industrialguidedtasks-summary__entry__12}

| Release | Release notes |
|-|-|
| Yokohama | No updates for this release. |
| Zurich | No updates for this release. |
| Australia | [Reports on question results](https://www.servicenow.com/docs/access?context=create-report-igt-question-results&family=australia&ft:locale=en-US) :   Analyze inspection results question by question. Create reports on the new Industrial Guided Task Result \[sn_icw_igt_results\] database view, which combines the question responses of each task with its functional location, equipment, standard, and shift. Users with the sn_icw.report_user role can filter or group results by these fields, or filter on a single assessment question. [Question bank](https://www.servicenow.com/docs/access?context=igt-question-bank&family=australia&ft:locale=en-US) :   Keep assessment questions consistent across standards without recreating them. Users with the new Industrial Guided Task Manager \[sn_icw_igt.manager\] role can create question banks and publish questions in them from the Assessment Workspace. Standard authors can then add published questions to sections in any IGT standard from the Task authoring tab. Each added question is an independent copy. [Authoring Guided Tasks](https://www.servicenow.com/docs/access?context=task-authoring-configuration-settings&family=australia&ft:locale=en-US) :   Design structured workflows with sections, steps, assessments, and conditional paths by using an authoring interface that enforces consistency and quality.Built‑in rules help to maintain consistency by following correct steps sequence, naming, and safety requirements. Authors can preview the guided tasks' end‑user experience before publishing. [Assessment-driven scoring, evaluation, and execution](https://www.servicenow.com/docs/access?context=scoring-industrial-guided-tasks&family=australia&ft:locale=en-US) :   Capture and evaluate task data by using multiple assessment types, including numeric inputs, selections, measurements, and conditional evaluations. Supports multiple assessment types including numeric inputs, selections, measurements, and conditional evaluations.Automatic scoring determines the following task outcomes based on configured thresholds: Successful, Unsuccessful, or Not Scored. Assessment data is captured for reporting, quality control, and continuous improvement. [Automation and Smart Actions](https://www.servicenow.com/docs/access?context=industrial-guided-tasks-reference&family=australia&ft:locale=en-US) :   Reduce manual intervention by configuring automation features that trigger follow‑up work, standard tasks, or actions based on assessment results.Complex logic can route execution flows, creating dynamic experiences that adapt to operator input. This reduces manual intervention and maintains consistent responses to equipment or process conditions. You need an additional plugin to use this functionality.Template capabilities for duplication of task structures. [Easy accessibility and execution](https://www.servicenow.com/docs/access?context=execute-igt-icw-mobile&family=australia&ft:locale=en-US) :   Execute guided tasks through a clean step‑by‑step interface that supports images, instructions, validations, and attachments for accurate task completion.Integrated barcode or QR scanning helps identify parts, equipment, or materials during task execution.Offline access to guided tasks in the ICW mobile application. Offline mode minimizes interruption in your work, even in low‑connectivity industrial environments. [IGT Lifecycle Governance](https://www.servicenow.com/docs/access?context=industrial-guided-task-life-cycle&family=australia&ft:locale=en-US) :   Govern your guided tasks through separated life-cycle states that provide clearer oversight and a better audit trail.Review and approval workflows helps in maintaining quality, safety, and operational standards of guided tasks before release. Historical versions are archived for audits, root cause analysis (RCA) investigations, and long‑term reporting. [Create standards using templates](https://www.servicenow.com/docs/access?context=creating-standards-from-templates&family=australia&ft:locale=en-US) :   Accelerate guided task creation by duplicating existing tasks or using them as reusable templates.Structural components such as steps, assessments, and conditional logic can be reused across multiple workflows, which maintains consistency while reducing authoring time. |
| Brazil | No updates for this release. |
[ ]

## Changes

Between your current release family and Brazil, some changes were made to existing Industrial Guided Tasks features.  
{#dfrn3-industrialguidedtasks-summary__entry__22}

| Release | Release notes |
|-|-|
| Yokohama | No updates for this release. |
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
| Brazil | No updates for this release. |
[ ]

## Removed

Between your current release family and Brazil, some Industrial Guided Tasks features or functionality were removed.  
{#dfrn3-industrialguidedtasks-summary__entry__32}

| Release | Release notes |
|-|-|
| Yokohama | No updates for this release. |
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
| Brazil | No updates for this release. |
[ ]

## Deprecations

Between your current release family and Brazil, some Industrial Guided Tasks features or functionality were deprecated.  
{#dfrn3-industrialguidedtasks-summary__entry__42}

| Release | Release notes |
|-|-|
| Yokohama | No updates for this release. |
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
| Brazil | No updates for this release. |
[ ]

## Activation information

Review information on how to activate Industrial Guided Tasks.  
{#dfrn3-industrialguidedtasks-summary__entry__52}

| Release | Release notes |
|-|-|
| Yokohama | No updates for this release. |
| Zurich | No updates for this release. |
| Australia | Activation information :   Industrial Guided Tasks is automatically installed when you install Industrial Connected Workforce Mobile Experience as part of the ICW Foundational SKU. You can request ICW Mobile from the ServiceNow Store. Important: Industrial Guided Tasks is available in the ServiceNow Store. For details, see the "Activation information" section of these release notes. |
| Brazil | No updates for this release. |
[ ]

## Additional requirements

If any additional requirements were introduced or changed for Industrial Guided Tasks we have noted them here.  
{#dfrn3-industrialguidedtasks-summary__entry__62}

| Release | Release notes |
|-|-|
| Yokohama | No updates for this release. |
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
| Brazil | No updates for this release. |
[ ]

## Browser requirements

If any specific browser requirements were introduced or changed for Industrial Guided Tasks we have noted them here.  
{#dfrn3-industrialguidedtasks-summary__entry__72}

| Release | Release notes |
|-|-|
| Yokohama | No updates for this release. |
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
| Brazil | No updates for this release. |
[ ]

## Accessibility information

Review details on accessibility information for Industrial Guided Tasks, such as specific requirements or compliance levels.  
{#dfrn3-industrialguidedtasks-summary__entry__82}

| Release | Release notes |
|-|-|
| Yokohama | No updates for this release. |
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
| Brazil | No updates for this release. |
[ ]

## Localization information

If there are specific localization considerations for Industrial Guided Tasks we have noted them here.  
{#dfrn3-industrialguidedtasks-summary__entry__92}

| Release | Release notes |
|-|-|
| Yokohama | No updates for this release. |
| Zurich | No updates for this release. |
| Australia | No updates for this release. |
| Brazil | No updates for this release. |
[ ]

## Highlight information

If there are specific highlight considerations for Industrial Guided Tasks we have noted them here.  
{#dfrn3-industrialguidedtasks-summary__entry__102}

| Release | Release notes |
|-|-|
| Yokohama | No updates for this release. |
| Zurich | No updates for this release. |
| Australia | * Design structured digital workflows faster with an enhanced guided task authoring experience. * Evaluate task outcomes accurately using a smart assessment engine with scoring rules, conditional logic, and validation. * Improve frontline execution with usability features such as barcode or QR scanning, step‑by‑step guidance, and offline support. * Track guided tasks through their full life cycle using intuitive workflow states that support clearer governance and audit readiness. * Extend task governance across the ICW suite through integrations with Industrial Standards, ICW Mobile, and ICW Core. See [Industrial Guided Tasks](https://www.servicenow.com/docs/access?context=exploring-industrial-guided-tasks&family=australia&ft:locale=en-US) for more information. |
| Brazil | No updates for this release. |
[ ]


