Migrate target breakdowns

  • Rversion finale: Australia
  • Mis à jour 12 mars 2026
  • 1 minute de lecture
  • After upgrading to Goal Framework for SPM v2.3.0 or later, run the Migrate BreakdownInterval To Checkinfrequency scheduled job to migrate the existing values from the Review frequency field to the Check-in frequency field in the target records.

    Pourquoi et quand exécuter cette tâche

    After running the job, the value in the Check-in frequency field for a target is populated based on the existing value in the Review frequency field of the target. If the existing value in the Review frequency field was set to any option other than None, then target breakdowns will be created for such targets based on the value in the existing check-in frequency of the target. For more information on how these values are migrated for targets with different values, see Target breakdowns migration.

    Avant de commencer

    Role required: admin

    Procédure

    1. Navigate to All > System Definition > Scheduled Jobs.
    2. Search for and select the Migrate BreakdownInterval To Checkinfrequency scheduled job.
    3. On the Scheduled Script Execution form, ensure that the frequency is selected as On Demand in the Run field.
    4. Select Execute Now.