Create a short test plan when the testing effort is minimal and you do not want to go
through the overhead of creating a test plan and a test cycle for a test execution
suite.
Avant de commencer
Role required: sn_test_management.test_manager
Procédure
-
Navigate to .
-
In the form, fill in the fields:
Tableau 1. Test Execution Suite form
| Field |
Description |
| Name |
Unique name for the test execution suite. |
| Planned start date |
Planned date and time for starting the test execution
suite. |
| Planned end date |
Planned date and time for ending the test execution
suite. |
| Planned duration |
Estimated duration for the test execution suite. This
duration is the difference between the planned start date
and the planned end date. |
| Number |
Automatically generated number for the test execution
suite. |
| State |
Current state of the test execution suite. |
| Assignment group |
Group working on test execution suite. |
Tableau 2. Progress section of the Test Execution form
| Field |
Description |
| Percent complete |
Percentage of test execution suites that have been completed. Value is calculated automatically. |
| Percent passed |
Percentage of test execution suites that have passed. Value is calculated automatically. |
| Percent failed |
Percentage of test execution suites that have failed. Value is calculated automatically. |
| Percent blocked |
Percentage of test execution suites that were blocked. Value is calculated automatically. |
-
Click Submit.
Que faire ensuite
- To add tests to the test execution suite, click Add
tests. From the Tests list, select the
required tests, and click Add to Execution Suite.
- To add test sets to the test execution suite, click Add test
sets. From the Test Sets list, select the
required test sets, and click Add to Execution
Suite.
- In the Test execution assignments related list, select
the test and assign it to a user.