Configure the time range for Orchestration ROI calculations

  • Rversion finale: Australia
  • Mis à jour 12 mars 2026
  • 1 minute de lecture
  • Select a date range to calculate the average number of tasks and the duration per month for the correlated tasks.

    Avant de commencer

    Role required: orchestration_manager

    Pourquoi et quand exécuter cette tâche

    By default, the system creates a range ending at the current date and time and extending back over the previous month. You can change this range at any time and recalculate the ROI instantly.

    Procédure

    1. Navigate to All > Orchestration > ROI Task Correlation > Time Range for Calculated Averages.
    2. Enter a new start or end date and time or click the icon to select a date using the calendar.
    3. Click Calculate to recalculate the ROI based on the new time range and to save your settings.