Assess RPO impact of technology assets on the business
Use the RPO impact assessment tab to enter asset information. The information can be critical from the objective of its recovery, the data value of the asset, and the frequency at which the data changes in the asset.
Before you begin
Role required: sn_bcm.program_manager or sn_bcm.planner
About this task
Not all elements require data backup, however technology assets like IT hardware and software require data backup due to the critical information content.
Procedure
Result
Calculation of Recovery Point Objective (RPO) for Impact Assessment Result
If the impact category contributes to RPO, then the RPO calculation is as follows:
RPO depends on the rating or the response that you give for each question in the impact category of RPO Impact Assessment.
Based on your response that you have selected for each Impact analysis question of an impact category, the system calculates the RPO.
For example, if two questions have a Medium (value is 20) response and one question has High (value is 30) as response, then the system considers the response whose value is maximum. Hence, in this case the impact rating is considered as High and the value is 30.
The impact rating has an integer value preconfigured in the Impact Rating table [sn_bcm_impact_rating]. This value is updated as the Category score for the corresponding impact category in the Impact Category Results table [sn_bia_category_result]. The system picks up the maximum category score across all impact categories. This score falls within a range of lower and upper threshold values. The threshold range within which the maximum score falls corresponds to a timeframe, which is stamped as Recovery Point Objective (RPO) in the Impact Assessment Result card of the BIA.
The mapping results of the threshold score and the timeframe are stored in the Score timeframe mapping table [sn_bia_score_timeframe_mapping].