    Create a quick recovery task form

    For description of the field values, see the table.
    Table 1. Quick insert panel fields
    Field Description
    Short description Brief name or description for the recovery task.
    Phase Phase of the recovery plan this task belongs to (for example, Preparation, Recovery).
    Plan recovery strategy Strategy to associate the task with a recovery strategy defined on the plan.
    Plan loss scenario Scopes the recovery task to a specific loss scenario defined in the plan, such as Loss of Datacenters. Tasks scoped to a loss scenario are surfaced only when the plan is exercised under that scenario type.
    Tag assets Option to specify the plan assets that are associated with this task. Available options are:
    • All
    • Specific
    • None
    Planned duration Anticipated time to complete the task, entered as Days, Hours, Minutes, and Seconds.
    Owner User responsible for completing the task.
    Assignment group Group assigned to the task.
    Additional assignees Other users who share responsibility for the task.
    Recovery team Recovery team associated with the task.
    All assets from plan Specifies the asset scope for the recovery task. Defaults to all assets defined in the plan. Update this field to narrow the scope when the task applies only to a subset of the plan's assets.