Simulate a risk assessment
Simulate a risk assessment to verify the associated risk assessment methodology (RAM) configuration when it is in the draft state.
Before you begin
Role required: sn_risk.admin
About this task
To modify the configuration of a published RAM, you need to delete all its assessments manually and change the RAM state to Draft. The simulation of risk assessment enables you to verify the RAM configuration when the RAM is in the draft state. This feature helps you to validate a factor, scoring logic, and the workflow and make necessary changes to the RAM before it is published. The simulated risk assessments are not used for risk aggregation and are deleted after the RAM is modified or published.