---
sourceDocument: Brazil Governance, Risk, and Compliance
sourceDocumentLink: https://www.servicenow.com/docs/r/governance-risk-compliance

 Release :

    - brazil

ft:locale :

    - en-US

ft:publication_title :

    - Brazil Governance, Risk, and Compliance

ft:clusterId :

    - grc

bundleId :

    - grc

workflow :

    - Technology


---

# Create an exercise

# Create an exercise {#ariaid-title1}

Release version: Brazil  
Updated September 10, 2026  
![](https://www.servicenow.com/docs/portal-asset/ico-clock) 4 minutes to read  
Create an exercise in BCM UIB Workspace. You can then test your business continuity and recovery plans on a planned date and monitor the completion of the event tasks.

## Before you begin

Role required: sn_bcm.program_manager, For event assignment group filter: sn_recovery.event_user, sn_recovery.event_manager

## Procedure

1. Navigate to WorkspacesBusiness Continuity WorkspaceExercisesPending and select New.
2. Fill in the required fields in the Details tab.  
   For more information on the fields, see [Create Exercise Event form](https://www.servicenow.com/docs/wZr6r2Er6aY3oopvfPR3SA "Use the Create Exercise Event form in BCM UIB Workspace to add details about an Exercise event.").  
   The exercise event is created in the Pending state and it is displayed in the List view. The state and details of the exercise event are displayed in the tabs:
   * Overview: You can view the current state and overall state progression of the exercise event.
   * Details: Update the fields in the form, such as Short description, Assigned to, Exercise method.
   * Assets: Select the impacted item type or the primary elements that you want to recover for an asset type.
   * Plans: Add an ad-hoc plan for the selected asset to the event.
   * Emergency Notifications: Create an emergency notification for the exercise event.
   * Event tasks: Add an ad-hoc task to the event.
   {#start-exercise-event-in-uib-ws__ul_dk1_4py_pxb}
3. In the User Administration or Assignment details section, locate the Assignment group and Assign to fields.
4. To assign group ownership, select the Assignment group field and select a group from the list.  
   The list shows only groups that hold the Event Owner or equivalent BCM Manager role. This role-based filtering ensures that only eligible groups are displayed as selectable options.
5. Select the Assign to field (individual owner) and select a user from the filtered list.  
   The list now shows only members of the group you selected in the previous step. You can choose the specific person responsible for the record.
   1. Assign individual ownership only by selecting the Assign to field, choosing a user, and saving the record.  
      The Event record is owned by the selected individual. The Assignment group field remains empty. This is the legacy ownership model and is fully supported alongside group ownership.
   2. Assign group ownership only by selecting the Assignment group field, choosing a group, leaving the Assign to field (individual owner) empty, and saving the record.  
      The Event record is owned by the group as a whole, with no specific individual designated. Any member of the group can take action on the record.
   3. Change the individual owner when a group is selected by selecting Assign to, clearing the current selection, selecting a new user from the filtered list, and saving the record.  
      The individual owner is updated while the group ownership remains unchanged.
   4. Handle the outside group scenario by selecting an individual owner, selecting the Assignment group field, selecting a group that does not include the previously selected owner, and saving the record.  
      The record saves with both the individual owner and the group. This accommodates cases where an individual outside the group is responsible for the record.
   5. Remove a group and revert to unfiltered selection by clearing the Assignment group field, selecting a user in the Assign to field, and saving.  
      The group field clears, reverting to individual-only ownership.
   6. Validate ownership requirements by verifying at least one of the Assignment group field or the Assign to field is populated and saving.  
      If both are empty, both fields are highlighted in red with an asterisk and a validation error appears. An informational banner prompts you to select either a group or an individual. The record saves only when at least one ownership field is populated.
   {#start-exercise-event-in-uib-ws__substeps_rxy_ytj_nkc}
6. Complete the remaining required fields on the Event record form and save the record.  
   The Event record is now owned by the selected group, with a specific individual designated as the point of contact. If the individual leaves the group, the group ownership remains intact, and another member can take
   over as the individual owner.
7. To perform more actions on the event, select More actions.

   | Step | Description |
   | Select Discuss. | Add the subject for the discussion and add participants that have access to the event record. Include a brief message for the participants and select Start discussion. |
   | Select Generate MS Word. | Generate a report of the BIA, BCP, exercise, or crisis record in Microsoft Word format. A Microsoft Word copy of the event record is generated and available for download. |
   | Select Generate PDF. | Generate a PDF of the event. A PDF of the event record is generated and available for download. In the Impact Assessments section of the PDF, details of the Smart assessment are covered, including questions and answers for RPO and RTO in a tabular format, along with dependencies, contributors, and attachments. |
   | Select 360º view. | Generate 360º relationships for the event. A graphical presentation of the event and its relationships is displayed. Refresh the planned order for the recovery task. |
   | Select Delete. | Delete the event record. A warning message is displayed that deleting the record will result in an automatic deletion of related records, which may also cause a cascade of additional records to be deleted. |
   |-|-|

   {#start-exercise-event-in-uib-ws__choicetable_ypb_yzx_xfc}
8. View your Event group's pending tasks and Event owner's assigned items in the My tasks page.
9. Review and confirm the group ownership, issue details, and collaboration thread details for the event in separate sections of the PDF and Microsoft Word reports.  
   For information on the collaboration block in Microsoft Word and PDFs, see [Create a collaboration thread in an exercise](https://www.servicenow.com/docs/_8nox7ZlStZpU3mvSf6bSA "Create a collaboration thread from an exercise and send an email to its recovery teams to coordinate a response."). For information on Microsoft Word template with collaboration block, see [Add a collaboration block to the Word template](https://www.servicenow.com/docs/_5Qfb3P9rTF~Z6WcRXNqMQ "Use the Block feature in Document designer to add a repeating collaboration section, including a nested action items table, to a customized event Microsoft Word template.").
10. Select Save.  
    The event is saved in the Pending state.
* **[Create Exercise Event form](https://www.servicenow.com/docs/wZr6r2Er6aY3oopvfPR3SA)**   
  Use the Create Exercise Event form in BCM UIB Workspace to add details about an Exercise event.

**Related concepts**   

* [My tasks page](https://www.servicenow.com/docs/8HkD~Ix95Ka1rT_Ylwdn_A "The My tasks page displays a single-pane view of your pending tasks, tasks assigned to your user group, and the tasks that are on your watchlist.")
* [Group ownership in BIA, plan, and event records](https://www.servicenow.com/docs/LCBvB2WUrE1gmtfFNGZIKQ "Assign a user group as the owner of business impact analysis (BIA), plans, and event records, instead of or alongside an individual owner. Every member of the owner group gets the same access to these records as an individual owner.")
* [Managing issues from Business Continuity Workspace](https://www.servicenow.com/docs/RDspwLk~M5hLOIX2x0vhfQ "Associate issues with business continuity plans to track problems identified during continuity planning. Create or add an existing issue from the Issues related list on a plan record.")

*[\>]: and then


