Agile work management in CWM

  • Release version: Australia
  • Updated March 12, 2026
  • 4 minutes to read
  • Summarize
    Summarized using AI
    This content was generated using new OpenAI-powered functionality. Results are provided on an as is basis and are not guaranteed to be accurate or complete.

    Summary of Agile work management in CWM

    Collaborative Work Management (CWM) offers a unified workspace for agile teams to manage their delivery cycle using familiar Scrum workflows. Teams can build and refine backlogs, plan sprints, execute work as stories and scrum tasks, and collaborate efficiently. CWM enhances this process with a flexible work item model, AI assistance, and expanded collaboration features, enabling smooth transitions from traditional Scrum tools.

    Show full answer Show less

    Key Features

    • Workspace Setup: Create Spaces and Boards to organize team work. Default work item types include Stories, Scrum tasks, and CWM Tasks, with the option to define custom types such as Bugs.
    • Backlog Management: Use the Sprint Planning view to add and prioritize work items in a centralized Backlog pane before scheduling them into sprints.
    • Sprint Planning: Define sprint duration, dates, and story point capacity. Drag and drop backlog items into sprints with capacity indicators to prevent over-commitment.
    • Work Execution and Tracking: Run active sprints using a Kanban board for visual status updates. Quick filters help teams focus on relevant sprints or states.
    • Scrum Tasks: Break stories into detailed scrum tasks for better effort estimation and workload distribution. Now Assist can auto-generate these tasks based on story context.
    • Dependency Tracking: Link work items with prerequisite, dependent, or related relationships across boards and Spaces to visualize cross-team dependencies without blocking progress.
    • Retrospectives: Create retrospective boards at sprint end to document successes and areas for improvement.
    • Connected Work: Integrate records from any ServiceNow application (e.g., incidents, defects) directly into CWM Boards, allowing unified backlog management and sprint planning without separate triage steps.

    Practical Differences from Agile Development 2.0

    • Work Item Hierarchy: CWM uses customizable work item types instead of fixed hierarchies, offering flexibility to fit team terminology and structure.
    • Unified Backlog: Connected Work replaces triage boards by directly importing source records into the backlog.
    • Program-Level Planning: CWM focuses on team-level execution, while Enterprise Agile Planning (EAP) supports program-level coordination. Integration between EAP and CWM enables combined visibility and execution.
    • Sprint Data Handling: Sprint-related data in CWM is managed within its interface and does not sync back to the classic UI, so using both systems simultaneously for the same stories is not recommended.

    Benefits for ServiceNow Customers

    Using CWM for agile work management enables teams to maintain familiar Scrum practices while leveraging enhanced flexibility and collaboration tools. Integration with other ServiceNow applications through Connected Work centralizes all work items, improving visibility and coordination across teams. The ability to customize work items and track dependencies directly within CWM supports scalable and transparent agile delivery. Additionally, linking CWM with EAP allows organizations to scale from team-level sprints to program-level planning seamlessly.

    Run your agile workflow in Collaborative Work Management (CWM), from building and refining a backlog to planning sprints, executing work as stories and scrum tasks, and collaborating with your team.

    CWM is a unified workspace where agile teams can manage their delivery cycle. Teams transitioning to CWM can continue to run the Scrum workflow they’re familiar with, which includes managing a backlog, planning and executing sprints, and tracking daily progress. They also benefit from CWM's flexible work item model, AI assistance, and broader collaboration features.

    Agile workflow in CWM

    The following end-to-end workflow shows how agile teams use CWM to plan and execute work.

    Agile methodology execution workflow in Collaborative Work Management. More details on the workflow follows.

    Set up your workspace

    Create a Space and a Board for your team. The Space is where all your work lives. CWM provides Stories, Scrum tasks, and CWM Tasks as default work item types. You can also define custom work item types to reflect your team's terminology, for example, Bugs. For more information, see Create a Board in CWM and Create and manage custom work item types in CWM.

    Build and maintain your backlog

    Add work items to your Board through the Sprint Planning view. All unscheduled work appears in the Backlog pane, giving your team a single place to groom, prioritize, and reorder items before pulling them into a sprint. For more information, see Add work items to Sprint planning Backlog in CWM.

    Plan sprints

    Create sprints by setting a duration, start and end dates, and story point capacity. Drag items from the Backlog into a sprint, or add them directly. Capacity indicators in each sprint section help teams avoid over-committing. For more information, see Create a sprint in CWM and Plan work items into sprints in CWM.

    Execute and track work

    Start the sprint and use the Kanban board to track work in progress. Team members move story cards across state lanes to update status. Use quick filters to focus the board on a specific sprint, state, or other columns to stay on top of what matters during the current sprint. For more information, see Start or complete a sprint in CWM.

    Break stories into scrum tasks

    For more granular daily execution, break user stories into scrum tasks. Scrum tasks are subtasks linked to a story, which help teams estimate effort, distribute work, and track daily progress. Create them manually from the story's Scrum tasks tab, or use Now Assist to generate them automatically based on the story context. When a story has scrum tasks, an indicator appears on the Kanban card so teams can quickly see stories that have been decomposed. For more information, see Scrum tasks for stories in CWM.

    Track dependencies

    Link work items to show how they relate to each other using three relationship types: prerequisite, dependent, and related to. These are informational relationships and don’t block task progress. You can link work items across boards and spaces, enabling visibility into cross-team dependencies without needing to be on the same board. For more information, see Task dependencies and relationships in CWM.

    Hold retrospectives

    At the end of each sprint, create a retrospective board to capture what went well and what to improve for the next sprint. For more information, see Create a retrospective board for a sprint in CWM.

    Bringing in work from other ServiceNow applications

    Agile teams often work on more than just stories. Incidents must be resolved, defects must be fixed, and enhancement requests must be delivered. The Connected work feature in CWM lets you bring records from any ServiceNow application into your Board by defining filter conditions. Once connected, you can plan those records into sprints and manage them alongside your stories from a single backlog.

    Teams who previously used the Unified Backlog and triage boards in Agile Development 2.0 to manage defects, incidents, and other work records. These teams can use Connected work to achieve a similar centralized view in CWM. For more information, see Connected work in CWM.

    Comparing CWM to Agile Development 2.0

    CWM covers the core Scrum workflow, but approaches some functional areas differently. The following describes how key Agile Development 2.0 concepts map to CWM.

    Functional area In Agile Development 2.0 In CWM
    Work item hierarchy Fixed hierarchy of Products, Epics, Stories, and Scrum Tasks.

    Create custom work item types to build a hierarchy that fits your team. There are no built-in Products, Releases, or Themes.

    You can use Spaces to separate product areas and Goals to connect work to business objectives.

    Unified backlog and triage Triage boards filtered records from other apps and automatically created stories for triaged items. The Connected work feature brings source records directly into the board backlog. So, no separate triage step required. Teams can plan them into sprints and update their status directly from the CWM Board. See Connected work in CWM.
    Multi-team and program planning Scrum Programs enabled coordination across multiple teams. CWM is optimized for team-level execution. For program-level planning such as PI planning, use EAP. EAP teams can connect to CWM so teams execute sprint work in CWM while program-level visibility remains in EAP. See Connecting EAP with Collaborative Work Management.
    Sprint data and classic UI Sprint data is stored on the story record and is visible when you open the story in the classic UI.

    Sprint, story points, and acceptance criteria in the CWM story panel are managed within CWM and are not written back to the classic story form. If you open a story using Detailed Form View, the Sprint field on the classic form appears empty. This is expected behavior.

    Note:
    Do not use CWM and Agile Development 2.0 simultaneously for the same stories. If your team manages sprint work in CWM, use CWM as the primary workspace for those stories.