Installed with Best Practice - Change Risk Calculator
Several types of components are installed with the Best Practice- Change Risk Calculator.
Tables installed with Best Practice - Change Risk Calculator
Best Practice- Change Risk Calculator adds the following table.
| Table | Description |
|---|---|
| Risk Conditions [risk_conditions] |
Represents the risk conditions, such as Insufficient lead time or Critical service affected. |