Modify Qualys PC Results start date

  • リリースバージョン: Australia
  • 更新日 2026年03月12日
  • 所要時間:1分
  • If data is missing for the start date in the Qualys PC Results import, it can be modified.

    始める前に

    Role required: sn_vul_qualys.admin

    手順

    1. Navigate to All > Qualys Vulnerability Integration > Administration > Primary Integrations.
    2. Click Qualys PC Results integration.
    3. Click Integration Details.
    4. Set the Start time field to a value in the past, so all scanned and detected test results, since that time, are detected.
      注:
      If the date is left empty, no data is returned on the first run. Set the value to a maximum of a month in the past. This setting keeps large amount of data from exceeding the Qualys API rate limitations, as well as triggering execution timeouts.
    5. Click Submit or Update.
    6. オプション: Click Execute Now to run immediately.