Configure the time range for Orchestration ROI calculations

  • リリースバージョン: Australia
  • 更新日 2026年03月12日
  • 所要時間:1分
  • Select a date range to calculate the average number of tasks and the duration per month for the correlated tasks.

    始める前に

    Role required: orchestration_manager

    このタスクについて

    By default, the system creates a range ending at the current date and time and extending back over the previous month. You can change this range at any time and recalculate the ROI instantly.

    手順

    1. Navigate to All > Orchestration > ROI Task Correlation > Time Range for Calculated Averages.
    2. Enter a new start or end date and time or click the icon to select a date using the calendar.
    3. Click Calculate to recalculate the ROI based on the new time range and to save your settings.