Configure an indicator by threshold, weightage, and order
Configure the Operational Technology (OT) Progress Scorecard indicators so that the display of each indicator meets your needs.
Before you begin
Role required: ot_progress_scorecard_editor or configure_industrial_workspace
About this task
You can configure the following indicators.
- Overall Score (%)
- % of Expected OT Devices in CMDB
- Classified OT Devices (%)
- Assigned OT Devices (%)
- OT Device Data Completeness (%)
- Mapped OT Devices (%)
- Backed up OT Devices (%)
- Approved OT Change Requests (%)
- OT Incidents with OT Context (%)