---
sourceDocument: Australia IT Asset Management
sourceDocumentLink: https://www.servicenow.com/docs/r/pt-BR/it-asset-management

 Release :

    - australia

ft:locale :

    - pt-BR

ft:publication_title :

    - Australia IT Asset Management

ft:clusterId :

    - itam

bundleId :

    - itam

workflow :

    - Technology


---

# Map enterprise assets to an operational schedule

# Map enterprise assets to an operational schedule {#ariaid-title1}

* Versão de lançamento: Australia
* 
* Atualizado 12 de mar. de 2026
* 
* ![](https://www.servicenow.com/docs/portal-asset/ico-clock) 1 min. de leitura

Create an asset schedule to map the enterprise assets to an operation schedule.

## Antes de Iniciar

Role required: sn_eam.enterprise_admin

## Por Que e Quando Desempenhar Esta Tarefa

An asset schedule record is stored in the Asset schedule policy \[sn_asset_cmn_schdule_policy\] table.  
Nota:  
If an asset isn't associated with an operational schedule, the Default asset schedule (24 hours, 7 days a week or 24/7) will be applied.

The Asset performance - Map schedule policies job runs weekly to sync the mapping between assets and the operational schedule.

## Procedimento

1. Navigate to WorkspacesEnterprise Asset WorkspaceAdmin centerKPI configuration.
2. From the KPI configuration list, select Asset schedules.
3. Select New.
4. On the form, fill in the fields.  
   {#create-asset-schedule-eam__table_tgv_h3c_wfc__entry__2}

   | Field | Description |
   |-|-|
   | Name | Unique name for the asset schedule. |
   | Source table | Source table for the assets. You can select any of the following tables: * Enterprise asset \[sn_ent_asset\] * Construction asset \[sn_ent_construction_asset\] * Facility asset \[sn_ent_facility_asset\] * Industrial asset \[sn_ent_industrial_asset\] * Linear asset \[sn_eam_linear_asset\] * Medical asset \[sn_ent_medical_asset\] * Retail asset \[sn_ent_reatail_asset\] * Tactical equipment asset \[sn_ent_tactical_asset\] * Transportation asset \[sn_ent_transportation_asset\] * Wearable asset \[sn_ent_wearable_asset\] * Hardware \[alm_hardware\] {#create-asset-schedule-eam__ul_mrp_z3c_wfc} |
   | Condition | Set a condition to select the assets that you want to associate with the operational schedule. For example, if you set the Department field to IT, the operational schedule is inked to all assets within the IT department. Nota: Select the source table before setting the condition. |
   | Schedule | Operational schedule that you want to associate with the assets. |
   | Priority | Order in which schedules should be applied to an asset when there are overlapping schedules. |
   | Active | Indicates whether the asset schedule is active. |
   [Tabela 1. Create New Asset schedule form]

   {#create-asset-schedule-eam__table_tgv_h3c_wfc}
5. Select Save.
6. **Opcional:** To sync the mapping between the assets and the operational schedules on demand, select Sync KPI records.

