# Maintenance schedule fields for Enterprise Asset Management

# Maintenance schedule fields for Enterprise Asset Management {#ariaid-title1}

* Versão de lançamento: Australia
* 
* Atualizado 12 de mar. de 2026
* 
* ![](https://www.servicenow.com/docs/portal-asset/ico-clock) 3 min. de leitura

A detailed description of all maintenance schedule fields in the Enterprise Asset Management application.

## Maintenance Schedule {#maintenance-schedule-fields-eam__section_qff_lvw_cwb}

{#maintenance-schedule-fields-eam__table_vy5_pyv_hvb__entry__2}

| Field | Description |
|-|-|
| Name | Name of the maintenance schedule. |
| Short description | Brief description of the maintenance schedule. |
| Trigger | Trigger that specifies the type of conditions that must be met for the maintenance to run. Select one of the following options: * Duration: Triggers the maintenance to run based on time. If you select this option, the Duration Details form section appears, where you can specify more details about the trigger. * Meter: Triggers the maintenance to run based on a specific enterprise asset field value. If you select this option, the Meter Details form section appears, where you can specify more details about the trigger. * Condition: Triggers the maintenance to run based on filter conditions. If you select this option, the Condition Details form section appears, where you can specify more details about the trigger. * Script: Triggers the maintenance to run based on advanced script criteria. If you select this option, the Script Details form section appears, where you can specify more details about the trigger. * Duration or Meter: Triggers the maintenance to run based on time or a specific enterprise asset field value, whichever comes first. If you select this option, the Duration Details and Meter Details form sections appear, where you can specify more details about the trigger. {#maintenance-schedule-fields-eam__ul_tmb_fzv_hvb} |
| Active | Option that indicates if the maintenance schedule is active. |
[ ]

{#maintenance-schedule-fields-eam__table_vy5_pyv_hvb}

## Duration Details {#maintenance-schedule-fields-eam__section_bs4_mvw_cwb}

Nota:  
This form section appears only if you set the Trigger field to Duration or Duration or Meter in the Maintenance Schedule form section.
{#maintenance-schedule-fields-eam__table_wd2_pvw_cwb__entry__2}

| Field | Description |
|-|-|
| Trigger type | Frequency at which you want the maintenance to run. Select one of the following options: * Interval: Runs the maintenance at a specified time interval. If you select this option, the Days, Hours, Minutes, and Seconds fields appear, where you can specify the amount of time that must pass before the maintenance runs again. * Weekly: Runs the maintenance once a week. If you select this option, theDue day of week and Due time fields appear, where you can specify the day and time at which you want the maintenance to run each week. * Monthly: Runs the maintenance once a month on a specific date. If you select this option, the Due day of month and Due time fields appear, where you can specify the date and time at which you want the maintenance to run each month. * Annually: Runs the maintenance once a year on a specific date and month. If you select this option, the Due month, Due day of month, and Due time fields appear, where you can specify the month, date, and time at which you want the maintenance to run each year. * Week in Month: Runs the maintenance once a month during a specific week of the month. If you select this option, the Due week in month and Due time fields appear, where you can specify the week and time at which you want the maintenance to run each month. * Day in Week in Month in Year: Runs the maintenance once a year on a specific day, week, and month. If you select this option, the Due month, Due week in month, Due day of week, and Due time fields appear, where you can specify the month, week, day, and time at which you want the maintenance to run each year. {#maintenance-schedule-fields-eam__ul_yd2_pvw_cwb} |
| Lead time | Number days required for the scheduled maintenance work. |
[ ]

{#maintenance-schedule-fields-eam__table_wd2_pvw_cwb}

## Meter Details {#maintenance-schedule-fields-eam__section_b4z_mvw_cwb}

Nota:  
This form section appears only if you set the Trigger field to Meter or Duration or Meter in the Maintenance Schedule form section.
{#maintenance-schedule-fields-eam__table_ksc_1ww_cwb__entry__2}

| Field | Description |
|-|-|
| Field | Enterprise asset field that you want to match against to trigger the maintenance to run. |
| Every | Field value that an enterprise asset must match to trigger the maintenance to run. |
[ ]

{#maintenance-schedule-fields-eam__table_ksc_1ww_cwb}

## Condition Details {#maintenance-schedule-fields-eam__section_g1q_nvw_cwb}

Nota:  
This form section appears only if you set the Trigger field to Condition in the Maintenance Schedule form section.
{#maintenance-schedule-fields-eam__table_k52_2ww_cwb__entry__2}

| Field | Description |
|-|-|
| Filter Condition | Filter conditions that trigger the maintenance to run You can add multiple filter conditions to the trigger using the following options: * or: Enables you to specify any of the conditions that an enterprise asset can meet to trigger the maintenance to run. * and: Enables you to specify all the conditions that an enterprise asset must meet to trigger the maintenance to run. * + New condition set: Enables you to specify additional sets of conditions that an enterprise asset can meet to trigger the maintenance to run. {#maintenance-schedule-fields-eam__ul_n52_2ww_cwb} |
[ ]

{#maintenance-schedule-fields-eam__table_k52_2ww_cwb}

## Script Details {#maintenance-schedule-fields-eam__section_ovl_4vw_cwb}

Nota:  
This form section appears only if you set the Trigger field to Script in the Maintenance Schedule form section.
{#maintenance-schedule-fields-eam__table_vrs_hww_cwb__entry__2}

| Field | Description |
|-|-|
| Script | Script specifying the advanced criteria that triggers the maintenance to run. |
[ ]

{#maintenance-schedule-fields-eam__table_vrs_hww_cwb}
**Conceitos relacionados**   

* [Domain separation and Enterprise Asset Management](https://www.servicenow.com/docs/H~_PDMF5LG2cKPQ3VmtJvA "Domain separation is supported in Enterprise Asset Management. Domain separation enables you to separate data, processes, and administrative tasks into logical groupings called domains. You can control several aspects of this separation, including which users can see and access data.")  
**Referência relacionada**   

* [Enterprise Asset Management roles](https://www.servicenow.com/docs/~4h6kintfN~NUsROAFCrRg "The following roles help you to configure and use the Enterprise Asset Management application to manage the life cycle of your assets, parts, and their hierarchical relationships.")
* [OT Asset Workspace roles](https://www.servicenow.com/docs/ly~3DoOPDsMHx_4I8Y8Arw "The following roles help you to manage the OT Asset Management application.")
* [Asset fields for enterprise assets](https://www.servicenow.com/docs/I~Kpu3uVu13s6BwC9TXK7g "A detailed description of all asset fields in the Enterprise Asset Management application.")
* [Asset audit fields for enterprise assets](https://www.servicenow.com/docs/QG3SEW62BUPtQRNV_ykAmw "Create New Asset Audits form and related fields description.")
* [Audit results](https://www.servicenow.com/docs/3~vyUT6YmMjDyWv5MbUxSQ "The Audit results shows the status of the assets when the scheduled or blind audits of asset stockrooms and other locations is complete.")
* [Enterprise model categories and corresponding classes](https://www.servicenow.com/docs/y58IiaTPGa6O8NjwkOoWmQ "Enterprise model categories and their corresponding Configuration Management Database (CMDB) configuration item (CI), asset, and model classes.")
* [Mandatory fields in the bulk import spreadsheets](https://www.servicenow.com/docs/U1LvOgXALHEojIQRHbyolQ "A list of the mandatory fields in the model, asset, and model and asset templates for bulk import in the Enterprise Asset Workspace.")
* [Normalization status for enterprise models](https://www.servicenow.com/docs/xlMX0U076N6Vp9HogOUR9Q "Description of the normalization statuses for enterprise models.")
* [Model fields for Enterprise Asset Management](https://www.servicenow.com/docs/LO0iS65nbXpwWKkxq3W4ew "A detailed description of all model fields in the Enterprise Asset Management application.")
* [Contract fields for Enterprise Asset Management](https://www.servicenow.com/docs/cRBDvyQ7fqvXkur~oND42A "A detailed description of all contract fields in the Enterprise Asset Management application.")
* [Maintenance plan fields for Enterprise Asset Management](https://www.servicenow.com/docs/nQrWXlx6vJwsLSA4rShM2A "A detailed description of all maintenance plan fields in the Enterprise Asset Management application.")
* [Work plan fields for Enterprise Asset Management](https://www.servicenow.com/docs/s5lgqK0eCT_OdV8lbeFZTA "A detailed description of all work plan fields in the Enterprise Asset Management application.")
* [Work plan schedule fields for Enterprise Asset Management](https://www.servicenow.com/docs/wHK4jcZdXiUjO03zOA~gqw "A detailed description of all the work plan schedule fields in the Enterprise Asset Management application.")
* [Expense line fields for Enterprise Asset Management](https://www.servicenow.com/docs/T5nFzTMcaVjOTqJTueOtWw "A detailed description of all expense line fields in the Enterprise Asset Management application.")
* [Fields inherited from a parent asset group to a sub group](https://www.servicenow.com/docs/NATE9xm61s3Zmw2QsLVFvQ "A list of all the fields that are inherited from the parent asset group to a subgroup.")
* [Enterprise asset disposal order stages](https://www.servicenow.com/docs/P8FHdXKlIgx5pyCAPWgNLw "An enterprise asset disposal order goes through various stages in the disposal process before it’s completed. With each stage, the task that's associated with that stage changes too.")
* [Terminology for linear assets](https://www.servicenow.com/docs/stYtFDIe6dNuyFq21v3oRA "Terms commonly used for linear assets in the Enterprise Asset Management application.")
* [Installed with Enterprise Asset Management for Healthcare](https://www.servicenow.com/docs/~SlYue0GfTrY54hdVmnC8w "The user role components, plugins, and applications are installed with activation of the com.sn_eamhc plugin.")
* [Installed with OT Asset Management](https://www.servicenow.com/docs/cu8PE9Qr5uwDoTqUxbL0oA "The user role components, plugins, and applications are installed with activation of the com.sn_otam plugin.")
* [Components installed with Enterprise Asset Management for Data Center and Network Asset Management (DCNAM)](https://www.servicenow.com/docs/xwJG5BYCks9VkzCDgQdhOw "Several types of components are installed with activation of the com.sn_eam_dcnam plugin, including user roles, plugins, and applications.")
* [Components installed with Enterprise Asset Management for Providers](https://www.servicenow.com/docs/XY_iHw61~9P9wFqZKrNzJQ "Several types of components are installed with activation of the com.sn_eam_provider plugin, including user roles, applications, and tables.")
* [Scheduled jobs and tables installed with normalization of firmware models](https://www.servicenow.com/docs/68JXoM1CTZ7Kr4siY0QRtA "Scheduled jobs that run during the normalization of firmware models embedded into Operational Technology (OT) assets and tables that store firmware normalization details are installed with the OT Asset Management application.")
* [Asset put away task fields](https://www.servicenow.com/docs/S5C_pPt_ix7nB0u8TA5FXg "Fields on the Asset put away task form help you create a put away task for the in stock assets.")