Create an Industrial Guided Task from Recommended Actions

  • Versão de lançamento: Australia
  • Atualizado 12 de mar. de 2026
  • 1 min. de leitura
  • Create an Industrial Guided Task (IGT) based on the Recommended Actions for a deviation.

    Procedimento

    1. Navigate to Lists > Deviations.
    2. Open the deviation that you need.
      The standard appears in the Suggestions tab of the Recommendations sidebar if any of the following conditions are met:
    3. On the card for the recommended standard, create a task from a recommended standard by selecting Create task.
    4. Opcional: Remove a recommendation from the sidebar by selecting Dismiss.
      The card disappears but the action is saved in actions history.