Flow Designer: Populate date using Flow Designer
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
04-23-2024 06:17 AM
I have a requirement to populate date field on RITM using flow designer.
Scenario: When the record is getting created in table (XYZ), the flow gets triggered and via subflow RITM is created.
I have a date field in RITM and date value is called to subflow as : Input -> Record -> Date(This is passed as string to the date field). This when sent to the RITM, it is getting displayed wrongly (eg: 14/Apr/0036) while the input being 30-10-2024.
I thought it was due to mismatch in date format and developed a flow variable which will convert the input date value to instance format (DD/MMM/YYYY). Now this flow variable is passed to date field as: Flow variable -> Date conversion (i tried passing it as string also as date). This time, the field is empty on RITM.
Can someone help here.
Thanks for your time.