single on call calendar for multiple assignment groups.

-DC-
Kilo Contributor

Newbie here.

 

I have several assignment groups that have the same staff assigned. Each of these are being added to on-call which leads me to recreating the same schedule for each group. How can I have multiple assignment groups point to a single on-call schedule? 

1 REPLY 1

Dr Atul - LNG
Tera Patron

Hi @-DC- 

NO, we cant create the same oncall schedule for more than 1 group, may be try to bind these group as child and create parent group and try.