Preparing for Fiber Optic Installation
Prior to installing fiber to the home (FTTH), a fiber provider conducts civil engineering, make ready, and permitting works, which include the following tasks:
- Civil Engineering: site survey, terrain inspection, utility conflicts analysis (e.g., power and water), mapping
- Make Ready: on-site examination of the ground or poles being used to bring fiber from the street, towards the home
- Permitting: submission of engineering plans, details of installing or moving equipment, and securing municipal rights of way
Hello experts, do you see the usage of any of the components in SPM being used in this use case?
The above mentioned stages are to be implemented and viewed through ServiceNow, is the ask. Which modules should be used. A detailed explanation is highly appreciated.
Regards,
Anish