Create scripted allocation metrics - Legacy

  • 릴리스 버전: Australia
  • 업데이트 날짜 2026년 03월 12일
  • 소요 시간: 2분
  • You can create scripted metrics and methods using the standard Cost Allocation Metric form.

    시작하기 전에

    Role required: cost_transparency_admin

    이 태스크 정보

    You can create weighted metrics in scripted form and scripted methods Allocation metrics - Legacy for more information.

    프로시저

    1. Navigate to All > Financial Modeling > Consumption Metrics > Create Scripted Weighted Metric.
    2. Click New.
    3. Select Scripted weighted metric or Scripted method in the Type field.
    4. Fill out the fields on the form as appropriate (see table).
    5. Click Submit.
      그림 1. Example scripted metric
      The Cost Allocation Metric form
      표 1. Scripted metric form fields
      Field Description
      Name Descriptive name of the metric.
      Allocation group The group associated with this metric. On the Cost Allocation Method form, the selection of the group limits the selection of the metric to only those metrics that use the group.
      System metric If this metric was created by the application in the workbench.
      Type The type of script. Select Scripted method or Scripted weighted metric to make the Script field appear.
      Script The script to calculate the allocation.
      표 2. Related List section of the Scripted metric form
      Field Description
      Cost Allocation Methods Methods that use the metric. You can add methods to the related list or navigate to the method form and select the metric you just created.
      주:
      You cannot delete a rule that is referenced by a locked allocation line.