Update a cost plan breakdown

  • 릴리스 버전: Australia
  • 업데이트 날짜 2026년 03월 12일
  • 소요 시간: 1분
  • Update a cost plan breakdown record that specifies the estimated and actual cost, at a granular level, for specific fiscal periods.

    시작하기 전에

    Role required: it_project_manager

    프로시저

    1. Open the required project.
    2. Select the Cost Plan related list.
    3. Select the Cost Plan Breakdowns related list.
    4. Select the i icon against a cost plan breakdown.
    5. Select Open Record.
    6. In the Cost Plan Breakdown form, view and update the enabled fields.
      For more information, see Cost plan breakdown form.