Create Calculated model lifecycle templates in the Enterprise Asset Workspace

  • Release version: Australia
  • Updated March 12, 2026
  • 1 minute to read
  • Create Calculated model lifecycle templates to manage the complete lifecycle of the models efficiently.

    Before you begin

    Role required: sn_eam.enterprise_asset_manager

    Procedure

    1. Navigate to Workspaces > Enterprise Asset Workspace > Asset Operations.
    2. From the Calculated model lifecycle list, select Calculated model lifecycle templates.
      The list of existing Calculated model lifecycle templates is displayed.
    3. Select New.
    4. On the form, fill in the fields.
      Table 1. Create New Calculated Lifecycle Template form
      Field Description
      Name Name of the Calculated lifecycle template.
      Description Brief information about the template.
      Active Option to indicate that the Calculated lifecycle template is available for use.
    5. Select Save.
      The Calculated Lifecycle formulas tab is displayed with the list of calculated lifecycle formulas for the following lifecycle phases:
      • End of Extended Support
      • End of Life
      • End of Sale
      • End of Support
      • End of General Availability
    6. Define the calculated lifecycle formula for a lifecycle phase.
      1. Select the calculated lifecycle formula.
      2. In the Phase start and Phase end fields, enter the number of months for calculating the start date and end date of the lifecycle phase.
      3. Select Save.
      The calculated lifecycle formula is updated with the values that you entered in the Phase start and Phase end fields.

    What to do next

    Associate the Calculated model lifecycle template with an enterprise model. For details, see Associate an enterprise model with a Calculated model lifecycle template.