Manage your portfolio backlog

  • 릴리스 버전: Australia
  • 업데이트 날짜 2026년 03월 12일
  • 소요 시간: 2분
  • Manage, evaluate, prioritize, and sequence epics in your portfolio backlog.

    시작하기 전에

    Role required: sn_portfolio_safe.safe_portfolio_user

    프로시저

    1. Navigate to All > Scaled Agile Framework (SAFe) > SAFe Board.
    2. From the choice list at the top left corner, select the level as Portfolio.
    3. Click the Backlog tab.
    4. To add an epic at the bottom of the backlog.
      1. Click Create Epic.
      2. Specify the required details in the form and click Submit.
    5. To add an epic while simultaneously deciding its order of implementation in the backlog.
      1. Select an epic in the backlog.
      2. Click Create Epic.
      3. Specify the required details in the form and click Submit.
        The epic is created beneath the epic that was selected in the backlog.
    6. To search for epics by their short descriptions, type a word in the search box and press Enter.
    7. To arrange epics within the backlog, use either of the following options.
      ActionDescription
      Using the drag feature Point to an epic and drag it to the required position.
      Using the keyboard
      1. Press the Tab key.
      2. After the desired epic is highlighted, press the Tab key.
      3. After the Icon used to move the record icon is highlighted, press the Enter key.
      4. After the Icon used to move the record icon appears, use the up and down arrow keys.
      5. To fix the position of the epic, press the Enter key.

      If the backlog contains more than 50 epics, then a pagination control appears at the bottom of the list enabling you to navigate to the first, last, previous, or next page in the list.

    8. To view the backlog as a standard platform list, click View Standard List.
    9. To perform any action on a set of epics.
      • Select the required epics.
      • Click Icon used to perform a single action on multiple features and select any of the following options:
      OptionDescription
      Move to top Epics are placed at the top of the backlog section.
      Move to bottom Epics are placed at the bottom of the backlog section.