Interested in a ServiceNow event built for developers? Registration for now[dev]26 is officially open!

How can change order of tabs in CollaborativeWorkManagementWorkSpace--ex:Details,Activity,Attachment

UdayKiranC61341
Tera Contributor

UdayKiranC61341_0-1783951096469.png

I have tried UI builder for collaborative workspace management but I haven't found anything where these tabs are coming, please assist and thanks in advance

3 REPLIES 3

Vikram Reddy
Tera Guru

Hi @UdayKiranC61341,

 

Assuming this is the stock Agile Board record page in Collaborative Work Management, the one your screenshot shows with Details, Scrum Tasks, Relationships and a More dropdown, the tab order isn't a workspace level setting, it lives on the record page itself inside UI Builder. Open UI Builder, pick the relevant Workspace Experience, open the record page for that table, and select the Tabs component (usually named Main Tab). Its config panel on the right lists every tab with a drag handle: reorder them there and publish. Whatever doesn't fit the visible row gets pushed into the More overflow automatically based on that same order, which is why Activity and Attachments landed there.

 

Thank you,
Vikram Karety
Octigo Solutions INC

prajaktakha
Tera Expert

Change the order in UI Builder

  1. Navigate to Now Experience Framework > UI Builder.
  2. Open the Collaborative Work Management Workspace experience.
  3. Open the page where your Story/Task record is displayed (Record page).
  4. Select the Record Information Panel (the right-side panel in your screenshot).
  5. Locate the component that renders the tabs (usually Tabbed Panel, Record Tabs, or Record Content Tabs).
  6. In the component properties, you'll find the list of tabs.
  7. Reorder them by dragging them into the desired sequence, for example:
    • Details
    • Activity
    • Attachments
  8. Save and Publish the experience.

Tanushree Maiti
Tera Patron

Hi @UdayKiranC61341 

 

Refer: https://www.servicenow.com/community/developer-forum/how-to-change-tab-order-in-case-record-page-in-...

 

 

Please Accept the solution if it assisted you with your question & Mark this response as Helpful.
Regards
Tanushree Maiti
ServiceNow Technical Architect
LinkedIn: https://www.linkedin.com/in/tanushreemaiti