TRM technical debt form

  • Release version: Washingtondc
  • Updated October 14, 2024
  • 1 minute to read
  • The Technology Reference Model (TRM) technical debts that are created for the products that aren’t aligned with the TRM phases and standards.

    Table 1. Technical Debt form fields
    Column name Description
    TRM product Name of the TRM product. A software product that is having version-specific life cycles.
    Business Application Name of the business application associated with the TRM product.
    Server Name of the server related to the TRM product.
    Note:
    This field is available from Technology Portfolio Management (TPM) plugin version 1.7.1.
    Software product model Name of the software product model related to the TRM product.
    Software product Name of the software product related to the TRM product.
    TRM phase Phase of the TRM product. The following TRM phases are available from the base system:
    • Approved: The technology is approved for use.
    • Approved with Constraints: The technology can be used within the specified constraints specified in the comments.
    • Divest: A decision was taken to divest from the use of the technology.
    • Evaluation: This technology is being evaluated and can’t be used to production purposes.
    • Unapproved: The technology isn’t permitted to be used.
    Note:
    You can modify these phases from the EA Workspace > Setup > TRM Phases
    TRM level The level (Product or Product Lifecycle) at which the technical debt is created.
    Version Version of the software product. Usually, the name of the Software product model contains this version.
    Reason The reason to explain why the technical debt was created.
    Last run Shows the timestamp when the custom scheduled job Populate TRM technical debts in the EA Workspace is run to update the table with technical debt.