Hello community,
I'm trying to figure out how does the integration between TPRM and Control objective/control works.
I was able to set up a metric (question) -> link it to CO -> I see link in assessment metrics on CO->I've linked the entity (Vendor) to CO -> control was generated -> I've pushed control to monitor state-> done the vendor assessment.
I see the results of vendor assessment on control record in "vendor risk assessment questions" but the status of the control has not changed.
What should I do to make it work?