Hey folks,
I'm currently facing a requirement where I have a Change Calendar report configured based on the Planned Start Date. I want the report to be highlighted by State by default, rather than having to manually select "State" from the Highlight by dropdown every time. Is there a way to set this as the default behavior? Attaching the snip below for reference.