Work plan schedule fields for Enterprise Asset Management
A detailed description of all the work plan schedule fields in the Enterprise Asset Management application.
Planned Work Schedule
| Field | Description |
|---|---|
| Name | Name of the work plan schedule. |
| Short description | Brief description of the work plan schedule. |
| Trigger |
Trigger that specifies the type of conditions that must be met for the work plan to run. Select one of the following options:
|
| Active | Option that indicates if the work plan schedule is active. |
Duration Details
| Field | Description |
|---|---|
| Trigger type |
Frequency at which you want the work plan to run. Select one of the following options:
|
| Lead time | Number of days required for the scheduled work plan. |
| Preserve calculated interval |
Option to restart the interval calculation from the time when the work order was completed. This check box appears when Interval, Monthly, or Annually is selected for Trigger type and Fixed is selected for the Monthly type and Annually type field. |
Meter Details
| Field | Description |
|---|---|
| Field | Enterprise asset field that you want to match against to trigger the work plan to run. |
| Every | Field value that an enterprise asset must match to trigger the work plan to run. |
| Preserve calculated meter |
Option to restart the meter calculation based on the value defined in the Every field. |
Condition Details
| Field | Description |
|---|---|
| Filter Condition |
Filter conditions that trigger the work plan to run You can add multiple filter conditions to the trigger using the following options:
|
Script Details
| Field | Description |
|---|---|
| Script | Script specifying the advanced criteria that trigger the work plan to run. |
Effectivity Details
| Field | Description |
|---|---|
| Start planned schedule on |
Option based on which the planned work schedule should determine its start date.
|
| Effective Start | Effective start date from when the planned work is scheduled to work. |
| Effective start reference |
Field value that should be used to determine the start date of the planned work. Effective start reference displays the list of fields from the table that is selected to create conditions for the work plan. For example, Printer [cmdb_ci_printer]. This field appears only when Field Value is selected from Start planned schedule based on. |
| Schedule |
Name of the schedule that should be used to calculate the start date of the work plan. This field appears only when Schedule is selected from Start planned schedule based on. |
| End planned schedule based on |
Determines the end date of a planned work schedule.
|