Welcome to Community Week 2025! Join us to learn, connect, and be recognized as we celebrate the spirit of Community and the power of AI. Get the details  

Dynamic Scheduling Assigned To Should not be based on Location

Shriram Joshi
Tera Guru
Tera Guru

I am working with Field Service Management (FSM) and using the Dynamic Scheduling feature. Currently, when creating a work order or task, the "Assigned To" field is being populated automatically based on the "Location" which is field on work order task.

However, I want to modify this behavior. Specifically, I do not want the "Location" to be considered when assigning a resource via Dynamic Scheduling. Instead, I would like to control the assignment based on other factors, without the "Location" playing a role in this decision.

How can I achieve this? Is there a way to configure Dynamic Scheduling to exclude "Location" from influencing the "Assigned To" field?


BR,
Shriram Joshi

---------------------------------------------------------------------------------------------

Mark this as Helpful / Accept the Solution if this helps.
0 REPLIES 0