Parallel flow logic in another parallel flow logic

Pooja119
Tera Contributor

Hi , 

There is a requirement where I need to create below flow in flow designer. Initially, there should be 2 tasks which will create parallelly. Based on completion of first task i.e Task A, 3 parallel tasks i.e. Task C, D, E should be created. When child task C or D or E completes. then next task should be created which are/is sequential to child task.  What i did, I used do the following in parallel loop to create Task A and B. And, I marked wait condition in Task A and Task B. Both tasks are creating in parallel. After completion of Task A, then Task C, D and E should be created parallelly. If condition is used to check whether Task A is Complete or Incomplete. After, If condition loop, I tried to used do the following in parallel logic to create Task C,D, E parallelly.  But, in flow logic list, Do the following in parallel logic option is not showing. Can't we use parallel flow logic in another parallel flow logic ?

After If condition, i tried to crate Task C, D,E tasks in then loop. But, If condition is giving error (run time value is open state and that value is not matching with Complete/Incomplete state. Please see below screenshot. 

 

Thank you!

 
image-20250210-145211.png

1 REPLY 1

Ankur Bawiskar
Tera Patron
Tera Patron

@Pooja119 

please share some screenshots.

If my response helped please mark it correct and close the thread so that it benefits future readers.

Regards,
Ankur
Certified Technical Architect  ||  9x ServiceNow MVP  ||  ServiceNow Community Leader