  • Test Management 2.0 offers a few usability enhancements over Test Management 1.0.

    Create and track the execution of tests for stories of the sprint in the Sprint Tracking tab in Agile Board. In addition, you can:
    • View the test result of each test.
    • Run all the tests for a story at one time.

      Sprint tracking tab in Agile Board.

    Easier way to create tests

    Test Management 2.0 provides a new user experience for creating tests.
    • Test steps can be created without leaving the context of test form.
    • Entire test scenario can be created at one time. Type in the step description, and press Enter to proceed to the next step.
    • You need not create an extra record to capture expected results. Expected results can be captured as another test step that is marked as a verification step.

      Illustration showing how to add test steps to the test

    Enhanced user experience for running tests

    Illustration showing how to run tests in the Test execution window

    Test Management 2.0 provides a new user interface for running tests. The interface opens in a small browser window, which can be placed side by side with the system that is being tested. You can go through multiple tests at one time, without having to relaunch the window. Whenever a step is marked as failed or blocked, you can add a comment and attachment to record your observation.

    Illustration showing how to add attachments and comments for a blocked or a failed step

    Visual approach of structuring test plans

    Test Management 2.0 provides a designated user interface, Test Board, for creating and structuring test plans. As a test manager, you can create a test plan, test cycles, and test execution suites and define the time frame for their execution. The names of the test cycles and execution suites can be edited inline, without leaving the page. Test execution suites can then be filled with tests, and those tests can be assigned to testers.

    The test plan work hierarchy item in the Test Board provides a visual representation of the timeline of the test plan and its child tasks using a blue task bar. The length of the task bar pertaining to the test plan increases and decreases depending on the adjustments you make to the duration of its child tasks. You can also manually increase or decrease the duration by dragging the edge of the task bar to the required location.Test plan work hierarchy item in Test Board. Planning tab in Test Board