Assign a project schedule
Without an assigned schedule, a project calculates a day as a full 24 work hours. To schedule tasks by a more realistic work day, assign a schedule to the project. If the schedules provided in the base system do not suit your needs, define a new one.
始める前に
Role required: it_project_manager
手順
- Open a project.
- If the Default view is active, right-click the header bar and select .
- Select a schedule in the Schedule field and select Save.