Schedule resources to be rightsized

  • リリースバージョン: Australia
  • 更新日 2026年03月12日
  • 所要時間:5分
  • To rightsize a resource, add it to a Rightsizing job and specify when the job should run. You can also move resources out of one scheduled job into a different job or remove a resource from a job.

    始める前に

    Run Discovery on each service account.

    Ensure that the Billing Download has completed for each provider.

    Ensure that the Price Sheet Download job has completed for each provider.

    Role required: insights_admin or insights_owner

    このタスクについて

    When you change the resources that are included in a job, Cloud Cost Management checks for the following conditions:
    • A resource in the job is owned by another user (as when a insights_admin updates a job that was created by an insights_owner or an insights_owner updates a job that was created by a different insights_owner).
    • The job was created by another user.
    If either condition is met, the app sends an email notification to the owner of the resource or the creator of the job.
    注:
    If a recommendation to rightsize a Google Cloud resource is dismissed from the Google Cloud management portal, the resource doesn't appear in Rightsizing recommendations.

    手順

    1. Navigate to Cloud Cost Management Workspace > Operations > Recommendations > Rightsizing.
    2. In the list on the appropriate tab, select the check boxes for the resources to rightsize.
      • To create a Rightsizing job for resources that are new candidates for rightsizing: On the New Recommendations tab, select resources and then select Schedule.
      • To create a new job for resources that had previously been scheduled but were not resized: On the Declined Recommendations tab or the Failed Recommendations tab, select resources and then select Reschedule.
    3. In the dialog box, fill in the fields.
      表 : 1. Schedule job
      Field Value
      Job type Type of job action.

      Select Schedule job.

      Job name

      Unique and descriptive name for the Rightsizing job.

      Schedule

      Date and time to run the Rightsizing job.

      Approval type

      Type of change request to use.

      • Auto approval: Generates and auto-approves a change request to resize the resource. The system also sends the approved change request to the change group. The resource is added to the list of resources that the job will resize.
      • Manual approval: Generates a change request (Normal Change type) for a member of the change group to resize the resource and continues to list the resource in the appropriate Rightsizing reports.
        注:

        The Short description, Description, Assignment group, and Affected CIs fields are auto populated. For more information, see Create a change request.

      Change template

      This field appears only when the Approval type is selected as Auto approval.

      Change request template (Standard Change type) to be used. If no template appears in the list, you must create one. See Create a change request template.
    4. Select Submit.

    タスクの結果

    The Rightsizing job is created and will run at the scheduled time.

    • Until a member of the change group approves or rejects the change, the resource state is set to Pending, the resource remains listed on reports, and no other action is taken.
    • If a member of the change group approves the request, the state is set to Approved and the resource is added to the list of resources that the job will resize.
    • If a member of the change group rejects the request, the resource state is set to Declined, the resource remains listed on reports, and no action is taken.