Create an operational schedule for enterprise assets
Define the scheduled operational time, which is the duration during which the asset will be in use, by creating an operational schedule.
始める前に
Role required: sn_eam.enterprise_admin
このタスクについて
An operational schedule record is stored in the Asset schedule [sn_itam_common_asset_schedule] table. If an operational schedule isn't defined, the Default operation schedule (24/7) hours is applied.
注:
The calculation of asset key performance indicators (KPIs) begins when the asset first moves to the In Use state. Therefore, the linked operational schedule must cover the entire period for accurate results.