How is Cost in functional currency calculated in Cost plan?

Elena Pomana
Tera Guru

Hello,

 

I have a demand with several Cost plans. 

 

I have a cost plan with 10 unit cost, quantity is 1, as far as I know "Total planned cost" is calculated (unit cost *quantity).

I don't get how Cost in functional currency is calculated and I have checked over the platform Business rules/Script includes which most of them seem to be on cost plan breakdown(cost_plan_breakdown) table. 

I thought that maybe the field is populated with total planned cost * value from itfm_fx_rate table but it seems I was wrong.

I have noticed that if I change End fiscal period, the value from cost in functional currency changes.

ElenaPomana_0-1675349329014.png

Can someone explain how is cost in functional currency(cost_default_currency) calculated?

Threads I've read:

 

Thank you,

Elena

 

1 ACCEPTED SOLUTION
5 REPLIES 5