AWA vs. On-Call Scheduling?
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎02-01-2022 06:34 AM
Hi All,
I need help evaluating which Application to use: On-Call Scheduling, or Advanced Work Assignment (AWA). The needs are:
- Ability to notify individuals that are on-call that an Incident has been assigned to them and for them to accept the Incident.
- Ability to escalate to secondary on-call team members (and manager if needed).
- Ability to send two different Incidents to two different Incidents to two different team members within the same group. (Example: the same group has team members that manage different Apps so based on the App, the Incident would go out to a different team member)
- Ability to page team members via SMS and Phone
Can someone help me determine which application will check all the boxes? It seems to me that On-Call Scheduling can only perform 1, 2, and 4 (with use of Notify and/or Twilio), whereas AWA can only perform 1, 3, and 4, but I could be wrong...

- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎02-02-2022 12:57 AM
Hello Andrew,
You may need to use both AWA and on-call scheduling, As 1st and 3rd requirement can be handled using AWA and others (2nd and 4th) can be handled using on-call scheduling.
In your 1st requirement, you need to have both AWA and On-call scheduling to have list of all on-call person before AWA helps on-call person to accept the Incident using agent workspace.
Hope it helps!!
Please Mark ✅ Correct/helpful, if applicable, Thanks!!
Regards
Sulabh Garg
Regards
Sulabh Garg