Join the #BuildWithBuildAgent Challenge! Get recognized, earn exclusive swag, and inspire the ServiceNow Community with what you can build using Build Agent.  Join the Challenge.

Stage on RITM has two different values although they have the same name

mfhaciahmetoglu
Mega Sage

Hi all,

 

I have two service catalog items. These have two different flows with stages. 

 

Both flows have the stage: Completed on the flow designer. See below.

 

mfhaciahmetoglu_0-1704288977555.png mfhaciahmetoglu_1-1704288995545.png

 

 

However, I realized that with one of the flows, the "Request Completed" (triggered by stage: completed) notification was not triggered. I was checking why this could have been happening and observed a strange difference:

 

Although both have the same stage name (Completed), the value of these are different for both:

mfhaciahmetoglu_3-1704289199072.pngmfhaciahmetoglu_4-1704289229665.png

 

One is complete, and the other is completed.

I don't understand why these turned out to be different. Does anyone know how we can fix this and choose "complete" one, instead of "completed" one. I cannot choose any as you type this stage on flow designer.

 

Thanks.

 

Best,

Firat

 

 

1 ACCEPTED SOLUTION

Clara Lemos
Mega Sage

Hi @mfhaciahmetoglu ,

 

It is worth checking the value of the stage in your flow 🙂 

You can do that by opening your flow ( in Flow Designer) clicking in the 3 dots on the top right > Flow Stages

 

Screenshot 2024-01-03 at 13.56.52.png

 

And check the value associated with the Label (name) : "completed"

 

Screenshot 2024-01-03 at 13.57.05.png

If that helps please mark my answer as correct / helpful!
And if further help is needed please let me know

Cheers

View solution in original post

1 REPLY 1

Clara Lemos
Mega Sage

Hi @mfhaciahmetoglu ,

 

It is worth checking the value of the stage in your flow 🙂 

You can do that by opening your flow ( in Flow Designer) clicking in the 3 dots on the top right > Flow Stages

 

Screenshot 2024-01-03 at 13.56.52.png

 

And check the value associated with the Label (name) : "completed"

 

Screenshot 2024-01-03 at 13.57.05.png

If that helps please mark my answer as correct / helpful!
And if further help is needed please let me know

Cheers