Copy an Industrial Guided Task standard
Copy an Industrial Guided Task (IGT) standard to reuse it as a template, without having to draft the entire standard from the start.
Before you begin
Role required: sn_icw_igt.standard_author
About this task
The standard can be in any state when it’s copied. The entire content of the standard is duplicated, including the smart assessment template. However, the scheduled plan associated with the standard and any versioning information aren't included in the copy.
Procedure
Result
The tile for the newly created copy of the standard appears in the Standards hub in the Draft state.