Action form

  • Release version: Australia
  • Updated March 12, 2026
  • 1 minute to read
  • The following table describes the field values for the Action form in Industrial Connected Workforce Mobile Experience.

    Table 1. Action form
    Field Description
    Short description Brief description of the action.
    Description Description of the action and its purpose.
    Functional location Industrial facility work area where the action is completed. The location is defined using the ISA-95 standard. Automatically filled based on the logged-in user's worker profile.
    Equipment Machine to which the action relates. This field is automatically filled if equipment is specified in the standard.
    Add attachment Attachment for the form, such as a file or image.
    Impact Measure of effect the action has on an industrial process. Can be one of the following:
    • 1 - Safety
    • 2 - Quality
    • 3 - Reliability
    • 4 - Operations
    • 5 - Other
    Urgency Measure of how long the action can be delayed until there's a significant impact on an industrial process. Can be one of the following:
    • 1 - Critical
    • 2 - Important
    • 3 - Routine
    • 4 - Not urgent
    Priority Priority that is set automatically based on impact and urgency. Can be one of the following:
    • 1 - Direct
    • 2 - This shift
    • 3 - Today
    • 4 - Within 7 days
    • 5 - Within 30 days
    Opened by User opening the action.
    Assignment group Team or department responsible for completing the task.
    Assigned to User that the action should be assigned to.
    Additional assignee list List of users to be notified or contributing to the task, but not as the primary assignee. Available options vary depending on the selected functional location or assignment group.
    Origin Task from which the action originates.
    Parent Task from which the action is being created. This field is automatically filled with the number of the parent task.
    Due date Date by which the task should be executed. If you don't set the due date, it’s calculated based on priority when you save the form.
    Escalate to User that the action should be escalated to.