Adjust notification from Scheduled Report
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
03-15-2024 09:32 AM
Hi all,
As part of a customer requirement, after a scheduled report has ran the generated file should also be sent to an external system and saved there.
I would like to add a link to that file and its location on the external system to the email created for the scheduled report.
Is there a way that I can make the notification hold (or stay in send-ready state, for instance) and then after the integration to the external system has ran place the link in the notification body and actually send it (force state to change to send would be possible)?
If no solution for this is possible, is there a way to disable the notification from the scheduled report?
Thank you,