Modify Qualys PC Results start date

  • 릴리스 버전: Australia
  • 업데이트 날짜 2026년 03월 12일
  • 소요 시간: 1분
  • If data is missing for the start date in the Qualys PC Results import, it can be modified.

    시작하기 전에

    Role required: sn_vul_qualys.admin

    프로시저

    1. Navigate to All > Qualys Vulnerability Integration > Administration > Primary Integrations.
    2. Click Qualys PC Results integration.
    3. Click Integration Details.
    4. Set the Start time field to a value in the past, so all scanned and detected test results, since that time, are detected.
      주:
      If the date is left empty, no data is returned on the first run. Set the value to a maximum of a month in the past. This setting keeps large amount of data from exceeding the Qualys API rate limitations, as well as triggering execution timeouts.
    5. Click Submit or Update.
    6. 옵션: Click Execute Now to run immediately.