Run the OT Network Map Cache Handler scheduled job
Configure this scheduled job to run after your Service Graph Connectors to populate the latest data to show in the OT Network Map.
始める前に
Role required: admin
手順
- Navigate to .
- Select the OT Network Map Cache Handler scheduled job.
- Select Execute Now.
タスクの結果
The scheduled job runs after the Service Graph Connectors, and the data used to create the nodes in the OT Network Map is populated.