Run the OT Network Map Cache Handler scheduled job

  • リリースバージョン: Australia
  • 更新日 2026年03月12日
  • 所要時間:1分
  • Configure this scheduled job to run after your Service Graph Connectors to populate the latest data to show in the OT Network Map.

    始める前に

    Role required: admin

    手順

    1. Navigate to All > System Definition > Scheduled Jobs.
    2. Select the OT Network Map Cache Handler scheduled job.
    3. Select Execute Now.

    タスクの結果

    The scheduled job runs after the Service Graph Connectors, and the data used to create the nodes in the OT Network Map is populated.