Example- Schedule Optimization

  • リリースバージョン: Australia
  • 更新日 2026年03月12日
  • 所要時間:4分
  • This example shows three different ways admins can configure the optimization engine to schedule tasks.

    Admins can configure Schedule Optimization to run overnight in batches to schedule a larger number of tasks or throughout the day at selected intervals based on events. Admins can also enable dispatchers to initiate Schedule Optimization from Dispatcher Workspace by configuring on-demand optimization.

    In this example, the organization is ensuring that agents complete as many tasks as they can during their shift without spending a lot of time traveling between tasks. A policy is configured to maximize assignments and minimize travel time. On-demand optimization is enabled for the dispatchers who are assigned to this group of agents.

    Admin Core Configurations for Schedule Optimization

    表 : 1. Schedule Optimization Properties
    Field Value
    Qualifier type for Schedule Optimization Assignment Group
    Number of seconds used for task scheduling resolution 1
    Maximum number of location points allowed in a map provider call 300
    表 : 2. Policies
    Field Value
    Name Maximum Assignments
    Active true
    Constraints Default values
    Overall objectives

    Maximize travel time (weight 1)

    Maximize task assignments (weight 1)

    Maximize assignments to earlier shifts (weight 1)

    表 : 3. Scheduling Attributes
    Field Value
    Name West coast config
    Active True
    Travel estimate provider Beans.ai
    Default policy Maximum Assignments
    Straight line estimate config West Coast
    Tasks State is one of: Pending dispatch or Scheduled
    On Demand applicable policy West Coast Dispatcher

    Batch Optimization Configurations

    表 : 4. Batch
    Field Value
    Name West Coast weekly
    Schedule start date 2023-12-01
    Run frequency Every 7 days
    Batch start time 22:00
    Batch end time 3:00
    表 : 5. Scope
    Field Value
    Name West Coast-Next 7 days
    Active True
    Scheduling attribute configuration West Coast config
    Rank 1
    Assignment horizon offset 00
    Assignment horizon range Days 7
    Optimization Batch West Coast weekly
    Start date 2023-12-01
    Batch start time 22:00
    Batch end time 3:00
    Assignment group San Diego North
    注:
    Select schedule now when the form is complete

    Intraday Optimization Configurations

    表 : 6. Intraday Configurations
    Field Value
    Name West Coast
    Active True
    Default scheduling attribute configuration West Coast config
    Default False
    Flow Schedule intraday jobs (default)
    Default processing window Workday 9:00-5:00
    Assignment group

    San Diego South - Enable On Demand = True

    San Diego North - Enable On Demand = True

    On-demand Optimization configurations

    表 : 7. On-demand values in Scheduling Attributes configuration
    Field Value
    On Demand applicable policy West Coast Dispatcher
    表 : 8. On-demand values in Intraday configurations
    Field Value
    Assignment group

    San Diego South - Enable On Demand = True

    San Diego North - Enable On Demand = True