Associate a task plan template to a work schedule

  • リリースバージョン: Australia
  • 更新日 2026年03月12日
  • 所要時間:3分
  • Map a single or multiple task plan templates to a planned work schedule. Add conditions to identify the relevant templates for the planned work records.

    始める前に

    Role required: sn_fsm_planned_wm.planned_work_admin

    このタスクについて

    If you set the template type of a work plan to Task plan template, you can link its planned work schedules with task plan templates. For more information, see Create a work plan.

    When the conditions specified in the planned work schedule template are met, tasks, cases, or incidents are created based on the defined task plan templates.

    For example, to meet the monthly audit requirement of inspecting multiple stores of the same organization simultaneously, you need to create individual planned work schedules for each audit. Link each schedule to a different task plan template. Include relevant conditions in each planned work schedule template to ensure the correct template is applied when generating tasks specific to each audit.

    手順

    1. Navigate to All > Field Service > Planned Work Management > Plans.
    2. Open a plan from the list of work plans.
    3. In the Planned Work Schedules related list, select a schedule to which you want to associate a task template.
    4. In the Planned Work Schedule Task Templates related list, select New.
    5. On the form, fill in the fields.
      表 : 1. Planned Work Schedule Task Template form
      Field Description
      Template Task plan template to be associated with the planned work schedule. For more information on the creation and usage of task plans, see Task Plan Templates.
      Schedule Planned work schedule to which you’re adding the template.

      This field is automatically set to the selected planned work schedule.

      Table Table that is associated with the corresponding work plan of this planned schedule.

      This field is automatically set to the table name selected for the work plan.

      Condition Filter conditions to determine the task plan template to be used to tasks based on the planned schedule.
    6. Select Submit.

    タスクの結果

    Task plan templates are linked to schedules, and when generating tasks for a specific work plan, the corresponding template is used.